r r r r r r r r r r r r r r t t r r r <br /> 5.Mitigation Monitoring and Reporting Program <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Monitor Timing Sign Off <br /> Party <br /> • Post-earthquake facility structure and quarry pit inspections. <br /> The EPRP shall be provided to all employees and a copy shall be provided to local fire and rescue departments <br /> as well as to the facility file at the County of San Joaquin Community Development Department. The applicant <br /> shall update and redistribute when information changes or revisions are necessary. <br /> 4.8 HYDROLOGY AND WATER QUALITY <br /> 4.8.1a: Excavation/Groundwater Separation.The project applicant,shall,at no time,extend the depth of Applicant RWQCB Ongoing <br /> excavation below the depth of the water table and shall maintain a vertical separation between the water table <br /> and the active mining surface. Determination of the water table depth shall be based on historic regional <br /> groundwater levels for the unconfined aquifer. The vertical separation shall be determined appropriate by a <br /> California-certified hydrogeologist or civil engineer but shall not be less than five feet. <br /> 4.8.1b:Groundwater Elevation Monitoring Schedule.The applicant shall monitor groundwater to ensure that the Applicant RWQCB October—April:Bimonthly <br /> vertical separation between the nearest groundwater surface and the lowest point of the active excavation and and within a week of a major <br /> reclaimed phases is maintained as required by the California-certified hydrogeologist and at no less than five feet. rain event. <br /> The groundwater levels shall be monitored on-site prior to and during all phases of excavation,prior to the May—September:Monthly. <br /> initiation of excavation for each phase,and in the reclaimed phases. Groundwater shall be continually monitored Reclaimed Phases:Monthly <br /> in the active mining area on a bimonthly basis,within a week following each large rainstorm from October through <br /> April,and monthly during the remainder of the year. Reclaimed phases shall be monitored once monthly. <br /> Monitoring technique shall be based on recommendations and approval by a California-certified hydrogeologist. <br /> 4.8.3:Prior to the commencement of excavations,the project applicant shall conduct a comprehensive well Applicant Health Prior to Phase I <br /> survey to locate,identify,and confirm all existing groundwater wells on the project site.Information for well Departmen (improvement plan approval <br /> locations shall be obtained,if available,from DWR, San Joaquin County Environmental Health Department, t(San or mining activity,whichever <br /> Stanislaus County,and the former property owners.Groundwater wells that will not remain in operation shall be Joaquin or occurs first) <br /> properly destroyed and removed in accordance with the DWR Well Standards,depending on location,under Stanislaus, <br /> permit and inspection from either the Stanislaus County Department of Environmental Health or San Joaquin as <br /> County as per the San Joaquin County Development Title,Section 9-1115.5(e).The well destruction shall be appropriate <br /> designed to create a sanitary seal that would not conduct vertical water flow in the event that the well is truncated ) <br /> or damaged during mining operations. <br /> 4.8.6:The applicant shall implement the Mining Plan Option 1 as described in Chapter 3.0, Project Description, Applicant CDD Prior to approval of <br /> and shown graphically in Figure 3-3.Mining Plan Option 1 requires the applicant to leave Hospital Creek in place, improvement plans <br /> mining both sides with a 100-foot setback from the centerline of the creek to the top of the mining slope. <br /> Cemex Vernalis Quarry Mining and Reclamation Project 5-7 ESA 1203015 <br /> Final Environmental Impact Repor[ June 2008 <br />