Laserfiche WebLink
Cemex Vernalis Quarry Mining and Reclamation Project <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Monitor Timing Sign Off <br /> Party <br /> would be cost-prohibitive.Catalytic particulate filters and the use of ultra low sulfur fuels do not substantially reduce NOx <br /> emissions. <br /> 4.6.4a:The applicant shall either utilize new model year on-site machinery equipped with the best available DPM Applicant CDD Prior to Phase I <br /> control technology,or retrofit its fleet of excavators,on-site haul trucks,and front end loaders with catalyzed DPM (improvement plan approval <br /> filters to minimize DPM emissions,or, in those limited instances where the retrofit would impede the function or life or mining activity,whichever <br /> of the equipment,or presents safety conoems,the applicant shall comply with alternative measures developed by occurs first) <br /> the Air Board. <br /> 4.6.4b: Implement Mitigation Measure 4.6.1. Applicant CDD Prior to Phase I <br /> (improvement plan approval <br /> or mining activity,whichever <br /> occurs first) <br /> 4.7: GEOLOGY,SOILS,AND SEISMICITY <br /> 4.7.4: Earthquake Preparedness and Response Plan.Prior to commencement of mining,the applicant staff shall Applicant CDD Prior to Phase I <br /> complete an Earthquake Preparedness and Response Plan(EPRP)to address worker safety and plant operation (improvement plan approval <br /> status during and following a major earthquake.The EPRP shall be included or become a supplementary or mining activity,whichever <br /> document to the standard site health and safety plan.The EPRP shall be prepared, implemented,and self- occurs first) <br /> monitored by the applicant.The EPRP shall include pre-earthquake and post-earthquake preparedness <br /> requirements for the facility that include: <br /> • Emergency evacuation routes to clear people of unsafe equipment and buildings, <br /> • Requirements for securing equipment likely to topple or undergo severe damage during an earthquake <br /> including procedures to avoid topple of furniture and small equipment, <br /> • Communication protocol during and following an earthquake, <br /> • Location of emergency equipment and first aid, <br /> • Transportation routes, <br /> • List of on-site contacts, <br /> • Procedures to locate and account for on-site personnel, <br /> • List of current phone numbers for San Joaquin County sheriff and fire prevention,and City of Tracy Fire and <br /> Rescue,and <br /> Cemex Vemalis Quarry Mining and Reclamacon Prolect 5-6 ESA/203015 <br /> Final Environmental Impad Repart June 2008 <br />