Laserfiche WebLink
I ( f f f f 1 ( 1 1 I 1 1 f fr IF f I I <br /> 5.Mkigation Monitoring and Reporting Program <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Monitor Timing Sign Off <br /> Party <br /> working day by plywood or similar materials or provide such holes or trenches with one or more <br /> escape ramps constructed of earth fill or wooden planks,inspect such holes or trenches for <br /> trapped San Joaquin kit fox prior to filling. <br /> 3. Inspect all construction pipes,culverts,or similar structures with a diameter of 4 inches or greater <br /> that are stored at a construction site for one or more overnight periods for kit foxes before the pipe <br /> is subsequently buried,capped,or otherwise used or moved in any way. <br /> 4. Contain all food-related trash items in closed containers and remove food-related trash at least <br /> once a week from the Project site. <br /> 5. No firearms shall be allowed on the project site. <br /> 6. No pets shall be permitted on the project site. <br /> 7. Use of rodenticides and herbicides on the project site shall be restricted to the use of zinc <br /> phosphide,in cases where it is necessary to protect public health and safety. <br /> 8. A representative shall be appointed by the project proponent who will be the contact source for <br /> any employee or contractor who might inadvertently kill or injure a kit fox or who finds a dead, <br /> injured or entrapped individual.The representative will be identified during the employee <br /> education program.The representative's name and telephone number shall be provided to the <br /> Service. <br /> 9. An employee education program shall be conducted and shall consist of a brief presentation by <br /> persons knowledgeable in kit fox biology and legislative protection to explain endangered species <br /> concerns to contractors,their employees,and agency personnel involved in the project.The <br /> program shall include the following:a description of the San Joaquin kit fox and its habitat needs; <br /> a report of the occurrence of kit fox in the project area;an explanation of the status of the species <br /> and its protection under the Endangered Species Act;and a list of measures being taken to <br /> reduce impacts to the species during project construction and implementation.A fact sheet <br /> conveying this information shall be prepared for distribution to the above-mentioned people and <br /> anyone else who may enter the project site. <br /> 10. In the case of trapped animals,escape ramps or structures shall be installed immediately to allow <br /> the animals)to escape,or the Service shall be contacted. <br /> V. Habitat compensation must be included in the form of replacement habitat at the following ratios: <br /> 1. 1:1 (one acre of habitat preserved for each acre of habitat lost)for 98 acres of agricultural land. <br /> Habitat must be preserved through land acquisition or payment of mitigation fees at USFWS- <br /> Cemex Vernalis Quarry Mining and Reclamation Projed 5-9 ESA 1203015 <br /> Final Environmental Impad Report June2008 <br />