My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cemex Vernalis Quarry Mining and Reclamation Project <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Monitor Timing Sign Off <br /> Party <br /> approved mitigation bank. <br /> 2. 3:1 (three acres of habitat preserved for each acre of habitat lost)for 1.16 acres of jurisdictional <br /> waters of the U.S.(Hospital Creek). Habitat must be preserved through land acquisition and/or <br /> habitat creation for each acre of habitat impacted.The preserved habitat shall be suitable for San <br /> Joaquin kit fox,shall be located within the Central Zone or the Southwest Zone as defined in the <br /> SJMSCP(§5.1.2.2),and shall be managed and maintained in perpetuity.Note that Mining Option <br /> 1 would avoid impacts to Hospital Creek,making habitat compensation unnecessary. <br /> 4.9.2b:The project shall avoid causing the failure of nesting tricolored colonies.The following mitigation Applicant CDD and Prior to each phase <br /> measures shall be implemented prior to implementation of any Phase of mining. SJCOG (improvement plan <br /> (CDD approval or mining activity, <br /> I. Comply with the SJMSCP for eligible Phases occurring within San Joaquin County. For Phases complying and whichever occurs first)of <br /> with the SJMSCP,no further mitigation is required. For phases not covered under the SJMSCP(at USFWS mining <br /> applicant's option or for potential habitat outside of the SJMSCP area),the following apply: for any <br /> II. Project Phases not complying with the SJMSCP,silt ponds,detention basins,or other bodies of water phases <br /> created by the project within 250 feet of the Phase shall be surveyed for breeding tricolored blackbirds; not <br /> this survey shall occur between March 15 and June 15.Any active colonies shall be protected from covered <br /> operations activities by a 250-foot buffer. under <br /> SJMSP) <br /> III. If silage crops are grown on project land prior to being mined or when reclaimed,these crops shall be <br /> surveyed by a biologist prior to harvesting.If tricolored blackbirds are nesting in the silage,the entire field <br /> shall not be harvested until the colony is no longer active. <br /> 4.9.2c: Conditions in the Proposed Project area currently provide breeding habitat for Swainson's hawk and Applicant CDD and Prior to each phase of <br /> white-tailed kite.Site conditions will change over the 26-to 60-year life of the project,therefore,the following SJCOG mining that would begin <br /> mitigation measures shall be implemented prior to implementation of any Phase of mining. For any Phase where (CDD excavation March 15— <br /> ground-disturbing activities would commence during the raptor breeding season(March 15 through August 31), and August 31 <br /> the applicant shall: CDFG for <br /> (1) Comply with the SJMSCP. For Phases complying with the SJMSCP, no further mitigation is required. pny hases <br /> For phases not covered under the SJMSCP(at applicant's option or for potential habitat outside of the not <br /> SJMSCP area),the following apply: covered <br /> (II) For Project Phases not complying with the SJMSCP,the applicant shall conduct pre-construction under <br /> surveys for nesting raptors in suitable habitat within one-half mile(for Swainson's hawk)and 500 feet(for SJMSCP) <br /> white-tailed kite)of the Phase boundaries. Surveys shall begin either at the beginning of the breeding <br /> season,or four weeks prior to beginning mining activities in the Phase,whichever is later. If nesting raptors <br /> are recorded within these buffers,the applicant shall not permit construction activities within these buffers <br /> Cemex Vernalis Quarry Mining and Reclamation Project 5-10 ESA/203015 <br /> Final Environmental Impact Repoli Juna 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.