Laserfiche WebLink
) ' <br /> e. The Traffic Impact Mitigation fee will be required forthis development. The fee is due and payable at <br /> the time of building permit application. The fee currently is$168.90 per daily trip-end in the Tracy <br /> area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. <br /> f. The Koster Road bridge across the Defta-Mendota Canal has insufficient strength and width for <br /> current highway standards. If the bridge is used for the haul route, it shall be modified to provide a <br /> clear width of 28 feet and meet current design standards. <br /> (1) If the entrance to the project is located on Koster Road, Koster Road,from the entrance to <br /> Blewett Road, shall be reconstructed to provide a road with a 24-foot pavement width with <br /> improved shoulders within the existing right-of-way and using a traffic index for a 20-year design. <br /> Blewett Road,from Koster Road to Bird Road, shall be reconstructed to provide a road with a <br /> 24-foot pavement width with improved shoulders within the existing right-of-way and using a <br /> traffic index for a 20-year design. Phasing of the reconstruction shall be permitted. <br /> (Development Tdie Section 9-1100.9) <br /> (2) If the entrance to the project site is located on Blewett Road, Blewett Road,from the main <br /> entrance to Bind Road,shall be reconstructed to provide a road with a 24-foot pavement width <br /> with improved shoulders within the existing right-of-way and using a traffic index for a 20-year <br /> design. Phasing of the reconstruction shall be permitted. (Development Title Section 9-1100.9) <br /> g. A traffic study shall be prepared to determine the structural section requirements of Koster Road, <br /> Blewett Road, and Bird Road or any impacts and mitigation measures. The developer shall deposit <br /> funds with the County for all costs,as estimated by the Public Facilities Division of the Department of <br /> Public Works, prior to Public Works preparing or contracting for the required study. Any mitigations <br /> required by the traffic study shall be provided by the applicant. (Development Title Section 9-1150.4) <br /> h. Access easements shall be required from adjacent property owners for any access roads through <br /> their properties. <br /> i. Runoff from off-site areas shall be controlled in a manner to prevent such flows from the 100-year <br /> flood event from entering the mining area. These controls could include drainage ditches and/or <br /> berms that would route water away from the tops of the proposed excavation and mining slopes. A <br /> drainage plan shall be prepared by a qualified and licensed engineer which provides runoff enrol <br /> and submitted for approval by the Department of Public Works Water Resources/Flood Control <br /> Division prior to the commencement of mining. <br /> j. When aggregate production permitted to access Bim Road and State Route 132 totals reach four <br /> million tons annually,DSS Engineering Contractors, Inc.,will be required to participate in a fair share <br /> financing program which must be adopted by the San Joaquin County Board of Supervisors. Fair <br /> share calculations are to consider only DSS's production increase over 250,000 tons(97 production <br /> base live). <br /> 3. PUBLIC HEALTH SERVICES <br /> a. An approved potable water supply must be provided for all employees. (Development Trtle Section <br /> 9-1100.1) <br /> San Joaquin County QX-96-10SS Company <br /> Community Development Page 7 <br />