Laserfiche WebLink
; <br /> -2- <br /> REASON FOR RECOMMENDATION: <br /> Ballard & Brennan, Inc. prepared an environmental noise assessment to determine <br /> whether the rescheduling of the quarry's hours of operation would adversely affect the <br /> existing residences in the project vicinity. The study concluded that, with the mitigation <br /> measures contained in the staff report, noise impacts could be reduced to a less than <br /> significant level during early morning/nighttime mining and processing operations. The <br /> mitigation measures would be monitored by the inspector performing the quarry's annual <br /> inspection. <br /> The project remained on the consent calendar and the Planning Commission voted 6-0 <br /> to refer this item to the Board of Supervisors with the above recommendation. <br /> A legal ad for the public hearing was published in the Stockton Record on June 28, <br /> 2002, and 94 public hearing notices were mailed on June 25, 2002. <br /> FISCAL IMPACT: <br /> None. <br /> ACTION TO BE TAKEN FOLLOWING APPROVAL: <br /> None. <br /> Sincerely, <br /> BEN HULSE <br /> DIRECTOR <br /> BH:KS:ss <br /> axle-1 BL <br /> Enclosure: Attachments°A" and "B", P.C. Minutes, Staff Report <br /> C: DSS Company <br /> Jose Alva <br />