Laserfiche WebLink
f J C) <br />`1 <br /> f <br /> the Environmental Health Division. (Development Title Sections 9-1110.3 and 9-1110.4) <br /> e. Construction of individual sewage disposal systems under permit and inspection by the <br /> Environmental Health Division is required at the time of development. (Development Title Sections <br /> 9-1110.3 and 9-1110.4) <br /> f. Refuse,garbage, and other solid waste material must be stored, removed,and transported to an <br /> approved landfill in accordance with San Joaquin County Ordinance Code Section 5-2400. <br /> g. Demolition of all dilapidated structures and removal of all demolition material from the premises to an <br /> approved landfill site is required in accordance with San Joaquin County Ordinance Code Section 5- <br /> 2401. <br /> h. A groundwater monitoring plan shall be submitted to the Environmental Health Division (EHD)for <br /> review and approval. The plan shall address overdraft, perched water,flow patterns, and possible <br /> changes in groundwater quality. EHD will charge for review and permitting as deemed necessary. <br /> 4. SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT <br /> a. EMISSION REDUCTION: The excavator shall implement the following measures during <br /> construction and operational activities in accordance with the SJVUAPCD Regulation VII and <br /> Fugitive Dust Control Practices: <br /> (1) All excavated and graded material, active areas of excavation, and traffic areas shall be <br /> sufficiently watered to prevent an excessive amount of dust being generated. <br /> (2) All clearing, grading, earth moving, and excavation activities shall cease during periods of high <br /> winds (greater than 20 mph averaged over one hour). <br /> (3) All material transported off the site shall either be sufficiently watered or securely covered to <br /> prevent an excessive amount of dust being generated. <br /> (4) Weed control shall be maintained by mowing instead of discing,whenever possible. <br /> (5) All inactive portions of the site shall be seeded and watered until vegetation is established or <br /> shall be treated with dust-retarding lignins or aggregate material not readily eroded by the wind. <br /> (6) On-site vehicle speeds shall be limited to 15 MPH. <br /> (7) The excavator shall use either water or petroleum-based palliative as a dust control measure. <br /> The use of petroleum-based palliative shall meet the road oil requirements of the San Joaquin <br /> Valley Unified Air Pollution Control District's Rule 409.5,"Cutback Asphalt Paving Materials." <br /> (8) The portions of Bird Road and Blewett Road adjacent to the excavation area and the entrarxces <br /> to the processing plant shall be swept whenever there is visible dirt in order to remove silt that <br /> may have accumulated from construction or excavating activities. <br /> (9) Gravel strips or wheel washers shall be installed where vehicles enter and exit unpaved roads <br /> onto paved roads. <br /> (10)AII internal roads planned for long-term use shall be paved. <br /> (11)Excess fugitive windblown dust shall be prevented by planting the proposed row crops as quickly <br /> r <br /> San Joaquin County QX-96-11DSS Company <br /> Community Development -11- <br /> i <br /> i <br /> I <br />