Laserfiche WebLink
MITIG .ON MONITORING PROGRAM FOR -96-1 <br /> (Revision of Approved Actions) <br /> IMPACT MITIGATION MONITORING ACTION RESPONSIBILITY TIMING <br /> NOISE <br /> The change 1. Aggregate stockpiles Review each Department of Annual <br /> in hours of should be maintained at condition of Public Works (or Inspection <br /> operation their current positions as approval at the consultant <br /> from 5:00 those stockpiles provide the quarry's hired by the <br /> a.m. to 9:00 partial shielding of annual review Department of <br /> p.m., to 1:30 processing area noise to Public Works) <br /> am to 5:30 the nearest residences to <br /> pm, has the the east and south. <br /> potential to <br /> result in a 2. Early morning/ <br /> significant nighttime mining activities <br /> noise impact within 600 feet of any <br /> to residence should not <br /> surrounding occur unless that <br /> property equipment is recessed at <br /> owners. least 40 feet within the pit <br /> as to be substantially <br /> shielded from that <br /> residence. <br /> 3. Overburden removal or <br /> initial mining activities <br /> within 600 feet from the <br /> existing residences for <br /> which the mining <br /> equipment is not recessed <br /> in the pit should be limited <br /> to hours during which <br /> operations currently occur <br /> (5:00 a.m.to 9:00 p.m.). <br /> 4. Front-loaders and other <br /> equipment which routinely <br /> utilize back-up beepers <br /> 17 which will operate at night <br /> should be retrofitted with <br /> either volume controls (set <br /> to the minimum levels <br /> required for safety), strobe <br /> lights, or radar based <br /> back-up beepers. <br />_5. <br />