My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> RESPONSE TO CONDITIONS OF APPROVAL FOR USE PERMIT X-96-01 <br /> DSS COMPANY—VERNALIS QUARRY <br /> CONDITIONS OF APPROVAL <br /> QX-96-01 . <br /> 2. DEPARTMENT OF PUBLIC WORKS: (Staff Contact: Gabe Karam,468-3023) <br /> a. The excavation plan shall be prepared by a Registered Civil Engineer and include the following: <br /> (1) Detail of access road first 100 feet from .i v es� er- °��-' Blewett Road shall be paved). <br /> ( P ) <br /> (2) Haul route. <br /> (3) Stockpile area for topsoil. <br /> (4) Any stockpile or excavation shall be 25 feet clear of the Koster Road right-of-way.' <br /> b. Loads shall be restricted to legal loads only. (Streets and Highway Title Section 10-2350). <br /> c. A video tape of road conditions on 4r�Blewett Road and Bird Road, along the haul route,is <br /> required prior to the start of excavation. The condition of these roads shall be reviewed with the <br /> Department of Public Works prior to the start of excavation and.every five years thereafter,(Development <br /> Title Section 9-1415.2) <br /> ' -� <br /> d. A Maintenance Agreement to ensure that , Blewett Road and Bird Road are <br /> maintained to a condition acceptable to San Joaquin County shall be executed by the applicant.The <br /> Maintenance Agreement shall be renewed every five(5)years. <br /> A 4eftd security or cash deposit in the amount and form acceptable to the Department of Public Works <br /> shall be filed with the Department with a guarantee that, if the Permittee fails,refuses,or neglects to repair, <br /> under permit, any damages to Blewett Road or Bird Road, along the haul route,which may <br /> result from Permittee's operations, the Department of Public Works may do the work necessary to restore <br /> those roads and bridges equal to,or better than, its original condition,using the funds from said bond <br /> security or cash deposit, subject to review and adjustment for inflation every five years. (Development <br /> Title Section 9-854.3) <br /> i <br /> e. The Traffic Impact Mitigation fee will be required for this development..The fee is due and payable at the <br /> time of building permit application.The fee currently is$170.30 per daily trip-end in the Tracy area.The <br /> fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. <br /> f _ <br /> 90 f919�'-Rcqveme <br /> feet?46-h�efiitwy and using a&-&ffie ipide.*feva 20 yea?-d,-sign. Bkwets Read;fr-em Kesteo-:Rea4 <br /> i <br /> • 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.