My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
».. °#^�4•s@ ;pC;; �; S°r..alrHi:.°� �: ,..., �x.;;a.p - ..;:.: - .. s ;e ,.:r::... <br /> 77) <br /> r a <br /> Environmental Impact Before Mitigation Level of Significance <br /> Mitigation Measures After Mitigation <br /> LS S <br /> Mitigation Measure 4.2-8c(A-1,A-2&A-3) LS SU <br /> 4 R The reclamation plan shall be modified to specifically require segregation(into stockpiles)of the A.- <br /> se <br /> 8-horizons of the existing softs during soil removal, The A-horizon soils shall be reserved to <br /> serve as the uppermost layer of soil in areas of the project site to be revegetated- The propone <br /> nt <br /> shall maintain a master map of stockpiled sods identifying the location and quantities of the <br /> segregated soils <br /> .4grfCuftGre an <br /> LandIlse fi a s on Ei -P N a ra • <br /> .. ., <br /> Impact 4.3-1 <br /> Displacement of People <br /> NOAB required. <br /> � z; , $ a s e » r •� <br /> All Alts. <br /> Impact 4.3-2 A-4 A-1,A-2& Mitigation Measure 4.3-1a(A-1,A-2&A-3): <br /> N Loss of Prime Farmland A-3 All Alts. <br /> The proponent shaff modity the reclamation plan to include the use of excavated topsoil for pit floor <br /> reclamation. The amount,location,and method which will be used to achieve topsoil placement on <br /> the pit floor shall be determined by the County and proponent, and shall be considered in conjunction <br /> with the requirements set forth in Mitigation Measures 4.2-8a,4.2-8b,and 4.2-8c. <br /> I <br /> mpact 4.3-3 A-4 A-1,A-2& Mitigation Measure 4.3-3a(A-1,A 2 8 A-3}: <br /> in Agricultural A_3 All Alts. <br /> duction <br /> The Proponent shall reclaim the project site to agricultural uses, consistent with the requirements and <br /> performance standards(CCR Section 3707)set forth in SMARA. Post-reclamation agricultural <br /> activities shall be at a productivity Level equal to or greater than pre-mining levels or to levels based T <br /> upon productivity levels for similar crops in the area. The proponent shall incorporate the proposed <br /> agricultural performance standards for the project site into the reclamation plan and re-submit the plan <br /> to the County for review and approval. To demonstrate successful <br /> proposed in the revised reclamation, the productivity levels <br /> reclamation plan shat!be maintained over two consecutive growing seasons, <br /> " Mitigation Measure 4-3-3b(A-1,A-2&A-3): <br /> The proponent shall implement Mitigation Measures 4.2-8a,4.2-8b,and 4.2-8c. <br /> LS=less than significant <br /> S=significant A-1 =Proposed Project <br /> SU=significant and unavoidable A-2=Proposed Project with Alternate Northern Access Road <br /> A-3=Proposed Project with Alternate Southern Access Road to New Interchange <br /> A-4=No Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.