Laserfiche WebLink
».. °#^�4•s@ ;pC;; �; S°r..alrHi:.°� �: ,..., �x.;;a.p - ..;:.: - .. s ;e ,.:r::... <br /> 77) <br /> r a <br /> Environmental Impact Before Mitigation Level of Significance <br /> Mitigation Measures After Mitigation <br /> LS S <br /> Mitigation Measure 4.2-8c(A-1,A-2&A-3) LS SU <br /> 4 R The reclamation plan shall be modified to specifically require segregation(into stockpiles)of the A.- <br /> se <br /> 8-horizons of the existing softs during soil removal, The A-horizon soils shall be reserved to <br /> serve as the uppermost layer of soil in areas of the project site to be revegetated- The propone <br /> nt <br /> shall maintain a master map of stockpiled sods identifying the location and quantities of the <br /> segregated soils <br /> .4grfCuftGre an <br /> LandIlse fi a s on Ei -P N a ra • <br /> .. ., <br /> Impact 4.3-1 <br /> Displacement of People <br /> NOAB required. <br /> � z; , $ a s e » r •� <br /> All Alts. <br /> Impact 4.3-2 A-4 A-1,A-2& Mitigation Measure 4.3-1a(A-1,A-2&A-3): <br /> N Loss of Prime Farmland A-3 All Alts. <br /> The proponent shaff modity the reclamation plan to include the use of excavated topsoil for pit floor <br /> reclamation. The amount,location,and method which will be used to achieve topsoil placement on <br /> the pit floor shall be determined by the County and proponent, and shall be considered in conjunction <br /> with the requirements set forth in Mitigation Measures 4.2-8a,4.2-8b,and 4.2-8c. <br /> I <br /> mpact 4.3-3 A-4 A-1,A-2& Mitigation Measure 4.3-3a(A-1,A 2 8 A-3}: <br /> in Agricultural A_3 All Alts. <br /> duction <br /> The Proponent shall reclaim the project site to agricultural uses, consistent with the requirements and <br /> performance standards(CCR Section 3707)set forth in SMARA. Post-reclamation agricultural <br /> activities shall be at a productivity Level equal to or greater than pre-mining levels or to levels based T <br /> upon productivity levels for similar crops in the area. The proponent shall incorporate the proposed <br /> agricultural performance standards for the project site into the reclamation plan and re-submit the plan <br /> to the County for review and approval. To demonstrate successful <br /> proposed in the revised reclamation, the productivity levels <br /> reclamation plan shat!be maintained over two consecutive growing seasons, <br /> " Mitigation Measure 4-3-3b(A-1,A-2&A-3): <br /> The proponent shall implement Mitigation Measures 4.2-8a,4.2-8b,and 4.2-8c. <br /> LS=less than significant <br /> S=significant A-1 =Proposed Project <br /> SU=significant and unavoidable A-2=Proposed Project with Alternate Northern Access Road <br /> A-3=Proposed Project with Alternate Southern Access Road to New Interchange <br /> A-4=No Project <br />