My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ••_• d`-••a..:J = 'D { t 1I s: t - '`. e,°- }1 S^ •rc_._-�, ,... �..... �. .A. ,6. 7 <br /> 71 ... <br /> t a ' ';_.,`;-J Table 2-1:SUMMARY OF IMPACTS AND MITIGATION MEASURES � <br /> Level of Significance Level of Significance <br /> Before Mitigation _ _ - w After Mitigation <br /> Environmental, - - Mitigation Measures <br /> » ar . <br /> LS S LS SU <br /> A'�IrY.%.Q.A°tld•xl°lty.'..,..:..�i„.:..n........y.�.s',<rs.::^:':r-,-e,,;.'.,..:r.,B.6-..�;-vt'....:..,,s.x',.,r.....e.,..�....m�kn.�.... R..§:S:.a.-.r.:e..r;.5 r;.....<�Et.<...t.ry a _=.:..'�,�..:,.f.K'.-n�..o�-ds.:Y?.�'.,....�.......,._.........,.4.a,_,_...a..-. ...�.rt-:s._,a.....;.......Y.„..a,'�.�._.....d.d_. _..°a_a T.....;�..�mav�m:x <br /> :>aa.:'•W.z;�»�°aa;'K:.0.-&' asE 'A?. <br /> 'I„n< <br /> Impact 4.5-1 - A-4- A-1,A-2& Mitigation Measure 4.5-1a(A-1,A-2&A-3) A-4 A-1,A-2 <br /> Plant Construction Emissions(PM,,, A-3 _ &A-3 <br /> ROG,NOK) The proponent shall implement the following measures during construction and operational activities <br /> in accordance with the SJVUAPCD Regulation V111 and Fugitive Dust Control Practices(SJVUAPCD, <br /> February 1995): <br /> i a) All excavated and graded material,active areas of excavation,and traffic areas shall be <br /> sufficiently watered to prevent an excessive amount of dust being generated <br /> j b) All clearing,grading,earth moving,and excavation activities shall cease during periods of <br /> high winds(greater than 20 mph averaged over one hour). <br /> N c) All material transported off the site shall either be sufficiently watered or securely covered to <br /> prevent an excessive amount of dust being generated. <br /> d) Weed control shall be maintained by mowing instead of discing, whenever possible. <br /> e) All inactive portions of the site shall be seeded and watered until vegetation is established <br /> r or shall be treated with dust-retarding lignins or aggregate material not readily eroded by the <br /> wind. <br /> f) On-site vehicle speeds shall be limited to 15 MPH. <br /> g) The excavator shall use either water or petroleum-based palliatives as a dust control <br /> measure. The use of petroleum-based palliatives shall meet the road oil requirements of <br /> ' the San Joaquin Valley Unified Air Pollution Control District's Rule 409.5:"Cutback Asphalt <br /> Paving Materials.” <br /> h) The portions of Bird Road and Blewett Road adjacent to the excavation area and the <br /> entrances to the processing plant shall be swept whenever there is visible dirt in order to <br /> remove silt that may have accumulated from construction or excavating activities. <br /> i) Gravel strips or wheel washers shall be installed where vehicles enter and exit unpaved <br /> roads onto paved roads. <br /> LS=less than significant A-1 =Proposed Project. <br /> S=significant A-2=Proposed Project with Alternate Northern Access Road <br /> SU=significant and unavoidable _ A-3=Proposed Project with Alternate Southern Access Road to New Interchange- <br /> A-4=No Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.