Laserfiche WebLink
y e. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> 1 <br /> shall be required where necessary far the control of erosion_ An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the redamatFon plan. (Development Tile <br /> Section 9-1415.3[dD <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter &1025 shall be met unless <br /> otherwise modified by conditions of the Quant' Excavation Permit. (Development Title Section 9- <br /> 1415.3[eD <br /> g. HOURS OF OPERATION: <br /> The followin hours of o ration shall a 1 <br /> (1) November 1-A I 30 6 months <br /> A. 5:00 a.m.to 9:00 .m. 16-hour shift for all activities associated with the ua o ration <br />�i {2} Ma 1 -October 31 6 months <br /> A. 7:00 .m.to 11:00 a.m. 16�hour shift for excavation and a ate rocessin of materials <br /> 16-hour shift for all activities associated with theua o ration <br /> excludin excavation and ate rocessin <br /> h. MITIGATION MONITORING PROGRAM;The following mitigation measures shall be monitored <br /> on an annual basis as provided for in the mitigation monitoring program for QX-96-1 (Attachment <br /> A): <br /> ate stockpile locations shall be maintained at their current positions as those <br /> Aggregate(1) <br /> stockpiles provide partial shielding of processing area noise to the nearest residences to the <br /> east and south. <br /> I <br /> (2) Early morning/nighttime mining activities within 600 feet of any met be substantince shall not ally <br /> unless that equipment is recessed at least 40 feet within the pit <br /> so asshielded from that residence. <br /> (3) Overburden removal or initial mina d In within it shall be limited to th 0 feet from the existing <br /> hoursresidences far <br /> which the mining equrpm of 5:00 a.m.t-0-9-,0-0P—.m. <br /> l4 equipment which routinely utilize back-up beepers which will operate at <br /> ( ) Front-loaders and other either volume controls (set to the minimum levels required for <br /> night shall be retrofitted with <br /> safety), strobe lights, or radar-based back-up beepers. <br /> i. WEED CONTROL• If noxious weeds are on the site, operations shall be in accordance with <br /> ural Commissioner of San Joaquin County_ (Development Title Section <br /> instructions from the Agricult <br /> 9-1415.3[hD <br /> line or right- <br /> SETBACKS: No excavation shall take place within twenty-five (25) feet of any property g <br /> ' I adjacent to said twenty-five (25) foot setback), unless the <br /> of-way (nor within the allowed slopes roin which case the elevation <br /> elevation prior to excavation is more than shall that of time abutting than�of the abutting property, at <br /> within said twenty-five (25) foot setback <br /> the property Bine. (Development True Section 9-1415.3hD <br /> QX-96-11DSS Company <br /> San Joaquin County <br /> Community Development <br />