My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t: <br /> signs shall be approved by the Director of Public Works. (Development Title Section <br /> 9-1415.3[6]) <br /> c. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other <br /> approved methods shall be required where necessary for the control of erosion. An <br /> erosion and sediment control plan approved by Development Services Division <br /> shall be part of the reclamation plan. (Development Title Section 9-1415.3[d]) <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be <br /> met unless otherwise modified by conditions of the Quarry Excavation Permit. <br /> (Development Title Section 9-1415.3[e]) <br /> g. HOURS OF OPERATION: Plant epeFatigRs shall normally be raF-ied on d pinq he <br /> hours fFem !:30 a.m. ai;d 5:30 p.m. The following hours of operation shall apply: <br /> (1) November 1-April 31 (6 months): <br /> (a) 5:00 a.m. to 9:00 P.M. (16-hour shift for all activities associatedwith the <br /> quarry operation <br /> (2) May 1 —October 31 6 months <br /> (a) 7:00 p.m. to 11:00 a.m. 16-hour shift for excavation and Processing of <br /> materials <br /> (b) 5:00 a.m. to 9:00 p.m. (16-hour shift for transporting of material_sl <br /> h. MITIGATION MONITORING PROGRAM: The following mitigation measures <br /> shall be monitored on an annual basis as provided for in the mitigation monitoring <br /> program for QX-96-1 (Attachment A): <br /> (1) Aggregate stockpile locations shall be maintained at their current positions as <br /> those stockpiles provide partial shielding of processing area noise to the <br /> nearest residences to the east and south. <br /> (2) Early morn ing/nig httime mining activities within 600 feet of any residence <br /> shall not occur unless that equipment is recessed at least 40 feet within the <br /> pit so as to be substantially shielded from that residence. <br /> (3) Overburden removal or initial mining activities within 600 feet from the <br /> existing residences for which the mining equipment is not recessed in the pit <br /> shall be limited to the hours a.Fn. to f 5:00 a.m. and 9:00 .m. <br /> (4) Front-loaders and other equipment which routinely utilize back-up beepers <br /> which will operate at night shall be retrofitted with either volume controls (set <br /> to the minimum levels required for safety), strobe lights, or radar-based back- <br /> up beepers. <br /> i. WEED CONTROL: If noxious weeds are on the site, operations shall be in <br /> accordance with instructions from the Agricultural Commissioner of San Joaquin <br /> County. (Development Title Section 9-1415.3[h]) <br />
The URL can be used to link to this page
Your browser does not support the video tag.