Laserfiche WebLink
void, or annul an approval of the local agency, advisory agency, appeal board, or <br /> legislative body concerning this Quarry Excavation permit. <br /> z. SEDIMENTATION POND DIKE DESIGN: A registered engineer shall design the <br /> proposed sedimentation pond dike. The design of the dike shall be reviewed and <br /> approved by an independent engineering or geo-technical firm selected by the <br /> Community Development Department. Said review shall be at the expense of the <br /> applicant. No more than fifty (50) acre feet of water shall be stored against said <br /> dike. <br /> JJ:vb <br /> QX-96-1(RA2)DC <br /> Attachments <br /> C: DSS Company <br /> Jose Alva <br /> " I <br /> i <br /> •• I <br /> i <br /> Y <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> o <br />