Laserfiche WebLink
i <br /> MITIGATION MONITORING PROGRAM FOR QX-96-1 <br /> (Revision of Approved Actions) <br /> IMPACT MITIGATION MONITORING RESPONSIBILITY TIMING <br /> ACTION <br /> NOISE <br /> The change in hours of 1. Aggregate stockpiles Review each Department of Annual <br /> operation from 6:00 aw to should be maintained at their condition of Public Works (or Inspection <br /> current positions as those approval at the the consultant hired <br /> i 1:30 a.m. to 5:30 stockpiles provide partial quarry's annual by the Department <br /> pm.to the following: shielding of processing area review. of Public Works) <br /> November 1 —A ril 30: 5:00 noise to the nearest <br /> a.m. to 9:00 p.m. all quarr residences to the east and <br /> activities) and May 1 = south. <br /> October 31: 7:00 p.m. to <br /> 11:00 a.m. (excavation & 2. Early morning/nighttime <br /> processing)and 5:00 a.m. mining activities within 600 <br /> to 9:00 p.m. (transporting of . feet of any residence should <br /> materials has the potential not occur unless that <br /> to result in a significant equipment is recessed at <br /> noise impact to surrounding least 40 feet within the pit as <br /> property owners. to be substantially shielded <br /> from that residence. <br /> 3. Overburden removal or <br /> initial mining activities within <br /> 600 feet from the existing <br /> residences for which the <br /> mining equipment is not <br /> recessed in the pit should be <br /> limited to hours dUFiR^Which <br /> . to 5:00 <br /> a.m. to 9:00 p.m. <br /> 4. Front-loaders and other <br /> equipment which routinely <br /> utilize back-up beepers which <br /> will operate at night should be <br /> retrofitted with either volume <br /> controls (set to the minimum <br /> levels required for safety), <br /> strobe lights, or radar based <br /> back-up beepers. <br />