My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002530
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
26088
>
2600 - Land Use Program
>
SA-01-21
>
SU0002530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:16 AM
Creation date
9/6/2019 10:47:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002530
PE
2633
FACILITY_NAME
SA-01-21
STREET_NUMBER
26088
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
ENTERED_DATE
10/29/2001 12:00:00 AM
SITE_LOCATION
26088 S LAMMERS RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LAMMERS\26088\SA-01-21\SU0002530\APPL.PDF \MIGRATIONS\L\LAMMERS\26088\SA-01-21\SU0002530\CDD OK.PDF \MIGRATIONS\L\LAMMERS\26088\SA-01-21\SU0002530\EH COND.PDF \MIGRATIONS\L\LAMMERS\26088\SA-01-21\SU0002530\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/21/2001 18:07 <br /> b ERD > 12f194683163 N0.178 906 <br /> III. Facility Overview <br /> Wellhead Power,LLC will operate a 49 MW generating unit,nominal,near Pacific as <br /> &Electric's Tesla substation site. The acreage for the proposed generating ficility G <br /> used for farming of annual crops. The placement of the facility has been chosen to <br /> minimize negative impacts to the landowner's operations and for convenient <br /> interconnection with PG&E's natural gas and electric transmission lines, which will both <br /> be within approximately 250 feet of the project site. The generating unit, associated <br /> equipment and buildings, and open space on the site will encompass approximately 1-5 <br /> acres and areas requiring protection and security will be enclosed with chain-link security <br /> fencing. <br /> It is expected that the generating unit will primarily operate during the period of June 1 <br /> through October 31 between the hours of 10:00 a.m-to 9:00 p.m, on weekdays- <br /> However,depending on the power supply situation in California,the generating unit <br /> could operate additional hours depending primarily on air permit 1mritations. The project <br /> is expected to be in service for an initial three-year terra, and depending upon contract <br /> and state peaking requirements up to eight years. <br /> The generating equipment win consist of gas turbine generators; modular control <br /> cabinets; associated ancillary equipment necessary to support operations of the gas <br /> turbine such as lube-oil skids,water pumps,water tanks, emissions control rnonitoM and <br /> a substation to increase the voltage from the generation voltage of 13.8 kV to the voltage <br /> of the adjacent transmission he of 115M It is expected the primary generators will be <br /> 49 mw Pratt&Whitney Twin-Pac gas turbine generator with associated equipment, or <br /> another equivalent natural gas fired turbine. The equipment selection when finalized will <br /> comply with all necessary permitting requirements. <br /> Environmental Considerations-, <br /> Water Resotoces and Waste Water Disposal <br /> Water will likely be used for one or two purposes, emission controland/or inlet-air <br /> cooling. Actual water requnenients will be driven by equipment selection,but usage is <br /> --- <br /> expected to be between 5 000 and 30,000 gallons lei' 1,0-houroperational day.ote at <br /> some equipment requires the use of water to reduce emissions, and the high volume <br /> water-use case would be due primarily to if such emissions controls are used. With an <br /> expected 100 to 125 days of operations per year,water usage would be between 500,000 <br /> and 3,000,000 gallons annually,or less than%acre-foot. WaUbead will either permit and <br /> develop a private well,or acquire water from the site-owner's well to serve this water <br /> requirement. Should the need for wastewater disposal be present(none is currently <br /> anticipated),necessary permits would be obtained before any discharge takes place. <br /> Wellhead Power,LLC Page 3 0321/01 <br /> Tesla/Tracy Peaks Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.