Laserfiche WebLink
r v <br /> Oct- 13-04 O8: 37A <br /> PA-04-519 (SA) <br /> Page 2 of 2 <br /> E. if floor drains are required, they must be plumbed through a sand/oil separator and discharged <br /> to an above ground system approved by the EnviromnenW Health Department. A registered <br /> engineer must design this system. The material collected in the above ground holding system <br /> must be analyzed for hazardous constituents prior to disposal. Specific test requirements may <br /> be obtained from the Environmental Health Department. A $186.00 plan check fee is <br /> required at the time of submittal. <br />