Laserfiche WebLink
parameters, we must review your proposed development plans and building plans before the <br /> County issues the building permit. <br /> Please also note that both water and sewer connections shall require an encroachment permit <br /> from the City prior to connection. The cost of encroachment permit includes the City inspection <br /> fees as well. The City requires connections of both sewer and water laterals to be made by a <br /> licensed contractor hired by the property owner. In addition, the water connection <br /> encroachment permit will be subject to upfront payment of water connection fee to the City <br /> established after the amendment of the existing agreement if executed between the City and the <br /> County as discussed above in my letter. <br /> Please feet free to call me at (209) 831-4600 if you have any questions or need further <br /> information. <br /> 1Sincerely, <br /> Kul Sharma <br /> City Engineer <br /> Cc: Zane Johnston, Interim City Manager <br /> Bill Reeds, Director Development & Engineering Services <br /> Cris Mina, Senior Civil Engineer <br />