Laserfiche WebLink
TABLE OF CONTENTS <br /> I. INTRODUCTION .................................................................... 1 <br /> IL SOIL SUITABILITY STUDY FINDINGS............................................... 3 <br /> A. SUBJECT PROPERTY AND SURROUNDING STUDY AREA INFORMATION .......... 3 <br /> B. SOIL PHYSICAL CHARACTERISTICS AND ANALYTICAL TEST RESULTS .......... 3 <br /> C. PERCOLATION AND INFILTRATION TEST RESULTS ............................. 4 <br /> D. GROUNDWATER INFORMATION ............................................... 6 <br /> CALCULATION OF ALKALINITY REQUIREMENTS FOR NITRIFICATION <br /> MOUNDING ANALYSIS <br /> E. SURFACE WATER INFORMATION .................... .......................... 9 <br /> CLIMATIC DATA:RAINFALL VERSUS EVAPOTRANSPIRATION <br /> M. NITRATE LOADING STUDY FINDINGS ............................................. 11 <br /> A. WASTEWATER FLOW PROJECTIONS AND CHARACTERISTICS... . . ............. 11 <br /> WASTEWATER FLOW VOLUME PROJECTIONS <br /> COMMERCIAL WASTEWATER CHARACTERISTICS <br /> B. CALCULATED NITRATE-NITROGEN LOADING ........ . . . . . . . . . . . ............. . 13 <br /> IV. MOUND SYSTEM DESIGN CRITERIA ............... . . .. . . . . . ............... 15 <br /> A. SEPTIC TANK,GREASE INTERCEPTOR TANK AND DOSING CHAMBER ..... . ... . 15 <br /> B. SITE PREPARATION ..... ... . ................. .... . . . ... ..................... . 16 <br /> C. CALCULATION OF MOUND DIMENSIONS ...... . . . .. . . . . . . . . ................... 16 <br /> D. OPERATIONAL COMPONENTS ................ . . . . . . . . . .. . . . .. .. . ............ . 18 <br /> E. MONITORING ................................... . . . ... .... . . . . . . .......... ... 19 <br /> V. CONCLUSIONS, RECOMMENDATIONS,MAINTENANCE ....... . . . . .. ............. 19 <br /> VI. LIMITATIONS ........................................................ .............. 22 <br /> VII. REFERENCES ...................................................................... 23 <br /> VIII. APPENDICES ..................................................................... . . 24 <br /> APPENDIX A: SITE PLAN AND S.C.J.PARCEL VIEWER MAPS(SSS§ 1.3, 1.4) <br /> APPENDIX B: SOIL PROFILE CHEMICAL ANALYSES OF PRIMARY DISPOSAL FIELD <br /> APPENDIX C: PERCOLATION/INFILTRATION TEST LOCATION AND RESULTS WITH LOG OF BORING <br /> APPENDIX D: CITY OF TRACY DOMESTIC WATER ANALYSES <br /> APPENDIX E: CITY OF TRACY DOMESTIC WATER SUPPLY DOCUMENT <br /> APPENDIX F: SURROUNDING SEPTIC SYSTEM REPAIR PERMITS <br /> APPENDIX G: CHAIN OF CUSTODY FORMS(SSS§4.6) jj <br /> Chesney Consulting <br />