Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-04-1 <br /> Calaveras Materials <br /> Site Approval Application No. PA-04-1 was approved by the San Joaquin County Community <br /> Development Department on March 11, 2004. The effective date of approval is March 21, 2004. This <br /> approval will expire on September 20, 2005,which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Jim Van Buren, 468-2374) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on- <br /> site parking, landscaping, signs, existing and proposed utility services, and grading (refer to the <br /> "SITE PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development <br /> Title Section 9-884) <br /> b. APPROVED USE: This approval is for the (1) relocating of the access entrance of a legal <br /> nonconforming ready-mix concrete facility and (2) replacing a existing dispatch office with a 24' <br /> by 60' new dispatch office as shown on the Plan dated January 5, 2004 . A revised site plan is <br /> required. The proposed location of the dispatch office shall meet Development Title building <br /> setbacks. <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. The Business License may be applied for concurrently with the building <br /> permit application. (Section 7-1000 of the County Ordinance Code) <br /> d. STORM DRAINAGE: Any additional stormwater drainage created by new improvements shall be <br /> retained on-site. The new drainage pattern and corresponding storm drain improvements shall <br /> be shown on the Site Plan. Drainage calculations prepared by a registered civil engineer or <br /> architect shall be included. (Development Title Section 9-1135) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All new parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth of asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9-1015.5[e]) <br /> (2) A minimum six (6) of new parking spaces shall be provided, including , one of which shall be <br /> van accessible. Accessible spaces shall be located as close as possible to the primary <br /> entrance (C.C.R., Title 24). (Development Title Section 9-1015.3) <br /> Conditions of Approval - 1 - PA-04-1 <br />