Laserfiche WebLink
e. LIGHTING: A light shall be placed on top of the 185-foot-high lattice tower to provide safety for local <br /> crop-duster businesses. <br /> f. MAINTENANCE OF FACILITIES: All freestanding structures and supporting equipment shall be <br /> maintained in good condition by the provider of the telecommunication facility and, whenever <br /> necessary, repaired or replaced. (Development Title Section 9-1065.7) <br /> g. REMOVAL OF FACILITIES: Freestanding structures and supporting equipment shall be <br /> removed by the provider of such facilities and the site restored to its pre-construction state if said <br /> facilities have not been operational or used for a period of six (6) consecutive months. Removal <br /> and site restoration shall be completed within ninety (90) days of the end of said six (6) month <br /> period. (Development Title Section 9-1065.8) <br /> 2. DEPARTMENT OF PUBLIC WORKS (See the attached memo dated January 30, 2001.) <br /> 3. DEPARTMENT OF PUBLIC HEALTH SERVICES (See the attached memo dated January 24, 2001.) <br /> Conditions of Approval - 2 - SA-01-2 <br />