Laserfiche WebLink
6 <br /> (5) Fire extinguishers shall be installed in accordance with California Fire Code, Standard 10-1 of <br /> Volume 2. <br /> (6) Fire permits may be required prior to occupancy to conduct operations hazardous to life or <br /> property. (C.F.C: 105.2.1) <br /> (7) A technical report to determine the acceptability of technologies, processes,.products, <br /> facilities, materials, and uses`attending the design, operation or use of.the building or <br /> premises may be required. (C.F.C. 1103.2.4) <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Michael Callahan, 468-3000) <br /> a.. An encroachment permit shall be required for work within'the road right-of-way. (Development <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standard R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c. Dedication to result in a 25-foot-wide right-of-way from the centerline.of Live Oak Road to the <br /> property line shall be required across the frontage of APN 063-100-19 and 063-130-01. <br /> (Development Title Section 9-1150.5) <br /> d. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is $720.00 per 1,000 gross <br /> square feet of building designated as Manufacturing in the Lockeford area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> i <br /> published by the Engineering News Record. (Resolution R-00-433) <br /> e. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> l f. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The final Site Plan is <br /> required upon submittal of verification. <br /> g. Prior to construction, this project must submit a Construction Notice of Intent(NOI)to comply with <br /> the State's National Pollutant Discharge Elimination System (NPDES)construction permit to the <br /> State Water Resources Control Board and develop and implement a Construction Storm Water <br /> Pollution Prevention Plan (SWPPP). <br /> h. Prior to beginning processing operations, this site must submit an Industrial Notice of Intent(NOI) <br /> to comply with the State's NPDES industrial permit to the State Water Resources Control Board <br /> and develop and implement an.Industrial SWPPP. <br /> i. A Reclamation Board permit shall be required for the process water pump station prior to any <br /> building permit. No process water shall be discharged to Bear Creek. <br /> j. The site construction shall not result in a run-off increase to Bear Creek. <br /> Conditions of Approval - 3- PA-0500686 <br />