Laserfiche WebLink
'Cortopassi Olive MITI Page 2 of 2 <br /> Our Project Number: LGS080529 <br /> July 25, 2008 <br /> The dynamic head was calculated to be 16.4 feet at 10 gallons per minute. An <br /> annotated pump chart is attached to this letter. <br /> Our professional services were performed, our findings obtained, and our <br /> recommendations proposed in accordance with generally accepted engineering <br /> principles and practices. This warranty is in lieu of all other warranties either expressed <br /> or implied. Test findings and statements of professional opinion do not constitute a <br /> guarantee or warranty, expressed or implied. If you have any questions, please do not <br /> hesitate to call. <br /> Sincerely, <br /> NEIL a ANDERSON&ASSOCIATES, INC. <br /> MALJ. <br /> David Welch, M. Sc., Principal Geologist oav,o N0.2151.2151 c <br /> CEG-2151, CHG-653, PGP-1049 * CERTSGZD <br /> ENGINEER NG <br /> �T)rc.OLOGFS �CIP <br /> of rn�Fo <br /> Attachments: Pump Curve <br /> Five (5) Sets of the Engineered Septic System Drawings <br /> 902 Industrial Way•Lodi,CA 95240-209.367.3701 •Fax 209.369.4228 02008 Nei[O.Anderson&Associates.Inc. <br />