Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> UP-00-05 <br /> supplied by the Department of Public Works and submitted to the Department of <br /> Public Works for approval. As an option, the Department of Public Works will prepare <br /> the drawing and estimate for an additional fee of$140.00.) <br /> (Development Title Section 9-1150.2) <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $601.00 per <br /> 1,000 gross square foot of building as Manufacturing in the Lockeford area. The fee <br /> shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. A credit may be allowed if it <br /> can be verified that the existing development on this site was in operation on or after <br /> April 23, 1990. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> 7. Deferred Frontage Improvement Agreement A-88-904 between the County of <br /> San Joaquin and Wood Fiber Products, Inc. for a future road, recorded as Instrument <br /> Number 88064852, San Joaquin County Records, shall be rescinded with the new <br /> Deferred Frontage and Roadway Improvement Agreement for Locke Road from <br /> Recommendation No. 3. <br /> GK:BN:mr <br /> PS-0GC%-W <br /> E: Thomas M. Gau, Deputy Director/Development <br />