Laserfiche WebLink
' headquarters including parking for 6 trucks and 24 trailers. Th.e Farm Services use type <br /> refers to administrative services, soil preparation services,.;and plant crop services; and <br /> f the storage of farm equipment-and material for'said:services, pro'Vided to farming <br /> operations on a fee or'contract basis:'Excluded`are those uses.classified under-the <br /> Agricultural Processing use.,type. Typical uses include faun headquarters offices and <br /> contract harvesting done"primarily by machine. (D'evelopment Title Section 9 115 445 <br /> Farm Services) This.approval is for contract"harvesting and farrri headquarters <br /> Therefore"the proposed trucks and trailers must only,be used for.the business nwi er, <br /> farming and contract harvestin <br /> g g operations: . x <br /> On August 3, 2006, the Community Development Department received;a customer s <br /> service. call for.exceeding the permitted use of six trucks anis twenty-four.trailers:" <br /> August 22, 2006, the applicant applied for.a-Revision. of Approved Actions application. <br /> Parking <br /> rking <br /> The number of parking spaces is determined by the use type, square footage of any <br /> buildings, and the number of employees. Development Title Section 9=1015.3 requires <br /> two (2) parking spaces per 1,000 square feet of building and 0.67 parking spaces for <br /> each employee. The employee requirements used to calculate parking spaces.refer to <br /> the maximum number of employees who could be working at one time when the facility <br /> is operating at full capacity. (Development Title Section 91015.3[d)) No buildings are <br /> proposed as part of this permit. Forty trucks will require forty drivers. Therefore, twenty- <br /> seven parking spaces are required (40 X 0.67 = 26.8), including two (2) accessible <br /> spaces One of:the accessible spaces must be van accessible <br /> All parking spaces and all major circulation drive lanes must be.surfaced and permanently <br /> maintained with a minimum of two (2) inches of asphalt concrete over an appropriate base. <br /> All other areas that are used for vehicular traffic shall be surfaced and permanently <br /> maintained with a chip seal. -Aggregate base may be used for trailer storage areas. <br /> Screening :. <br /> Development Title Section 9-1022.4(d)(1) states that if a commercial project abuts a <br /> residential zone, an area shown on the General Plan for residential use, or an existing <br /> residential use, a solid masonry wail six (6) to seven (7) feet in height must be erected <br /> along the abutting property line. There is a residence on the adjacent property to the <br /> south, therefore, a masonry wall is required along the southern property line adjacent to <br /> the residence for 150 feet from the east property line. A 180 foot buffer may be used in # <br /> lieu of the masonry wall. ! <br /> Building Permits <br /> The applicant must provide restrooms conforming with all disabled access requirements. <br /> (C.C.R., Title 24) The applicant may choose to build stand alone restrooms or convert <br /> the residence to an office. If the residence is to used as an office, then a change of <br /> occupancy permit is required. <br /> The building that is used as a truck repair facility was constructed without the benefit of a <br /> permit. Either plans must be submitted so that a building permit can be issued or the <br /> building must be removed. There is also a cargo container that is not on a trailer. Cargo <br /> 2 <br />