My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002619
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHART
>
7621
>
2600 - Land Use Program
>
SA-00-11
>
SU0002619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:20 AM
Creation date
9/6/2019 11:00:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002619
PE
2633
FACILITY_NAME
SA-00-11
STREET_NUMBER
7621
Direction
S
STREET_NAME
LOCKHART
STREET_TYPE
RD
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
7621 S LOCKHART RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOCKHART\7621\SA-00-11\SU0002619\APPL.PDF \MIGRATIONS\L\LOCKHART\7621\SA-00-11\SU0002619\CDD OK.PDF \MIGRATIONS\L\LOCKHART\7621\SA-00-11\SU0002619\EH COND.PDF \MIGRATIONS\L\LOCKHART\7621\SA-00-11\SU0002619\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
containers used as storage are treated the same as a building and therefore either must <br /> have a.permit or be removed. <br /> The Community Development Department has reviewed the proposed project arid, <br /> provided any outstanding issues are resolved, intends to approve this project subject to <br /> the following conditions of approval: <br /> Revised condltions for Site Approval Application No. SA-00-0011 was approved by <br /> the Community Development Department onrMay 4, 2000. The effective date of <br /> approval is May 14, 200 . This approval will expire onjuly 13 , which is SO <br /> f approval, unless 1 all Conditions of <br /> h from the effective date o <br /> days <br /> 18 months pp � ( ) <br /> Approval- have been compiled with, (2) all necessary building permits have been <br /> issued and remain. in,force, and (3) all necessary permits from other agencies have <br /> been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> .shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. . Ordinance <br /> requirements cannot be modified, and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Rick Griffin, [209] 468- <br /> 3154 <br /> a. BUILDING PERMIT: Submit an "APPLICATION-IMPROVEMEN PI <br /> COMMERCIAL BUILDING PERMIT'. The Site Plan required as a part of the <br /> I.,,pFeyefAeRt PlaR building permit must be prepared by a registered civil engineer <br /> or licensed architect. This Plan must show drainage, driveway access details <br /> including gates, on-site parking, landscaping, signs, existing and proposed utility <br /> services, and grading (refer to the "SITE PLAN CHECK LIST"for details). A fee is <br /> required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for a Farm Services facility to include a farm <br /> headquarters and contract harvesting . This approval includes the storage of farm <br /> equipment and materials for said services, including up to <br /> forty (40) trucks and ninety (90)trailers (a set of doubles counts as <br /> two trailers) as shown on the Plan dated MaFGh 7 2000 September 1, 2006. LLLse <br /> Type: Farm Services <br /> G. COMPLIANCE DATE; BeGaU68 this development is GUrrently op <br /> FequiFed pem;4s, the FequiFed improvement Plan shall be submitted within thirt <br /> days (june 13, 2000) and the GGRditiORS of AppFgval shall be Gompleted WithiR 60 <br /> days (july 13, 2000) fFOM the effeGWe date of . <br /> c. CAPITAL FACILITY FEE: This proiect may be sub'ect to the Capital Facility Fee. <br /> If the Capital Facility Fee is applicable, the County shall collect the fees before the <br /> issuance of any building permits. (Development Title Section 9-1245.2) <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License <br /> prior to the initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.