Laserfiche WebLink
Raymond Hoo -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-06-656(MS) <br /> 6. Drainage from the improved portion of each Parcels 1, 2, and 3 shall be retained on-site by a retention basin <br /> (18-inch maximum depth). Drainage for each pond shall be calculated by a registered civil engineer, an <br /> architect, or a licensed contractor,prior to issuance of the Building Permit. (Development Title Section 9- <br /> 1135.9) <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> Any work or encroachment within Lone Tree Creek shall require stream bed encroachment permits from <br /> San Joaquin County. <br /> DG:SH:av <br /> PTOMF4NfSWS\Y 20 TA-0bW %wpd <br />