My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008087
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LORENZEN
>
12
>
2600 - Land Use Program
>
PA-1000010
>
SU0008087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:20 AM
Creation date
9/6/2019 11:04:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008087
PE
2631
FACILITY_NAME
PA-1000010
STREET_NUMBER
12
Direction
W
STREET_NAME
LORENZEN
STREET_TYPE
RD
City
TRACY
APN
23914003 06
ENTERED_DATE
2/1/2010 12:00:00 AM
SITE_LOCATION
12 W LORENZEN RD
RECEIVED_DATE
2/1/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LORENZEN\12\PA-1000010\SU0008087\APPL.PDF \MIGRATIONS\L\LORENZEN\12\PA-1000010\SU0008087\CDD OK.PDF \MIGRATIONS\L\LORENZEN\12\PA-1000010\SU0008087\EH COND.PDF \MIGRATIONS\L\LORENZEN\12\PA-1000010\SU0008087\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Warren D . (Doug) Noteware <br /> Registered Civil Engineer No. 8714 <br /> 1615 Sheridan Way, Stockton , CA 95207 <br /> Phone : 209/477-2321 Fax: 209/477-2359 <br /> dougnoteware@comcast. net . <br /> OQRp4�ESSip,'�;q�e <br /> 4 4 � <br /> May 2 , 2012 <br /> Jp9r GF CAI/ � <br /> CALCULATION SHEET <br /> WASTEWATER DISPOSAL SYSTEM <br /> for <br /> EAGAL LAKES PHASE ONE <br /> (These calculations are for only Phase One of a possible two-phased project. <br /> They are based upon San Joaquin County's "Onsite Wastewater Disposal <br /> Standards" adopted October, 2003) <br /> Desiqn Criteria : <br /> 50 members and guests <br /> Maximum useage : 15 gallons per day per person . <br /> Planned operation : Seven months each year, from April through October. <br /> Average Daily Flow (adf) <br /> 50 users @ 15 gal/day = 750 gpd <br /> Septic Tank Capacity <br /> Use Basic Tank Capacity (btc) = 1200 gal . <br /> 1200 gallons plus adf = 1200 + 750 = 1950 gallons <br /> Use 2000 gallon minimum tank capacity <br /> Leach Lines <br /> Soil is sandy loam , so Soil Factor (sf) = 0 .200 <br /> Total length required is sf(adf + btc) . = . 2 (750 + 1200) = 390 ft. <br /> Use four 100' leach lines and provide a 100% set-aside area <br />
The URL can be used to link to this page
Your browser does not support the video tag.