Laserfiche WebLink
Page 2 of 2 <br /> 3/7/01 <br /> Fisher <br /> 4. A traffic study must be done in advance of any approvals due to the large number of <br /> vehicles expected on the site, and to ensure our safety. Other than parishioners, it appears that <br /> others will be invited to participate in the recreational facilities planned for the project. <br /> 5. A noise study must also be done to determine the impact of the outdoor amphitheater, <br /> on the Dutras'. We believe that at some point concerts of some type, at various hours of the day <br /> will be incorporated into the uses within the project. <br /> 6. The Dutras also want to advise both the County and the Applicant, that for the past <br /> forty-five years, they have utilized flood irrigation as their method of irrigating whichever crop <br /> they are growing at the time. This comment is made in light of the location of the leach field. <br /> The Dutras' want to make sure that there are no complaints in the future regarding, their <br /> irrigation methods and any water saturation of leach field. <br /> Thank you for allowing us to comment on the project. Please advise me as to the <br /> determination that you intend to make regarding the issues and co rns raised above. <br /> Sincer <br /> JOS L. ALVA <br /> Attorney at Law <br /> c: Client <br />