Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> SU-93-2 <br /> Dodds, et at <br /> Unless otherwise specified, all Conditions of Approval and Ordinance Requirements shall be <br /> complied with prior to the approval of the Final Map. <br /> This approval will expire three years from the date of approval unless (1) all Conditions of Approval <br /> have been complied with and (2) a Final Map has been filed with and accepted by the Surveyor's <br /> Division. <br /> Those Conditions followed by a Section Number or other Statutory Requirement are based on <br /> Ordinance requirements. Ordinance requirements cannot be modified. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Richard Larrouy, 468-3142) <br /> a. The minimum lot size shall be two acres net (Development Title Section 9-310.3). Lot <br /> sizes shall be shown on the Final Map. <br /> b. The minimum lot width shall be 150 feet (Development Title Section 9-310.4), except as <br /> otherwise noted in Section 9-310.4(a). Lot widths shall be shown on the Final Map. <br /> C. All subdivision road names shall be submitted for approval by the Community <br /> Development Department. (Development Title Section 9-1150.18) <br /> d. Street trees shall be planted pursuant to Section 9-1020.4 of the Development Title. <br /> e. The Designated Remainder shall be accurately shown on the Final Map. <br /> I. The driveway serving the residence on Parcel 22 shall be relocated from Parcel 21 prior <br /> to approval of the Final Map for Phase One. The barn and shed on Parcel 23 shall be <br /> removed under a Demolition Permit from the Building Inspection Division prior to approval <br /> of the Final Map for Phase One. <br /> g. Speiss Road shall be installed prior to approval of the Final Map for Phase One. <br /> In. Existing structures located on new property lines or within required setbacks shall be <br /> removed or relocated under permit from the Building Inspection Division. (Development <br /> Title Section 9-310.5) <br /> i. Development on the Designated Remainder shall be consistent with the provisions of the <br /> Flood Hazards Chapter (9-1605) of the Development Title. <br /> The developer shall submit an acoustical study for review and approval by the <br /> Development Services Division prior to approval of the Final Map for Phase One. The <br /> study shall address noise impacts associated with Lower Sacramento Road and State <br /> Route 99. Required attenuation features shall be installed prior to approval of the Final <br /> Map for Phase One. (Development Title Section 9-1025.9) <br /> Conditions of Approval - 1 - SU-93-2 <br />