Laserfiche WebLink
J <br /> k. All development on the site shall comply with the 'Trees' Division of the Development <br /> Title's Natural Resources Chapter. (Development Title Division 9-1505) <br /> 2. DEPARTMENT OF PUBLIC WORKS: (Staff Contact: Tom Iwamiya, 468-3023) <br /> a. All improvements shall be in conformance with the Improvement Standards and <br /> Specifications of the County of San Joaquin. All improvement plans and specifications <br /> shall include a grading plan for each individual lot, if applicable. These improvement <br /> plans and specifications are subject to a plan check and field inspection fees and must <br /> be approved by the Department of Public Works prior to approval of the Final Map. <br /> (Development Title Section 9-910.2) <br /> b. If improvements referred to herein are not completed prior to the approval of the Final <br /> Map, the subdivider shall execute an agreement with the County of San Joaquin to <br /> ensure the completion of improvements within one year after filing the Final Map. <br /> (Development Title Section 9-1100.3) <br /> C. Spiess Road shall be dedicated and improved to County standards for a 50-foot-wide <br /> right-of-way rural road. Silva Court shall be dedicated and improved to County standards <br /> for a 50-foot-wide right-of-way rural residential road. Dedication of appropriate road <br /> returns (snipes) shall be required. (Development Title Section 9-857.4) <br /> d. Lower Sacramento Road shall be improved on the subdivided side to County standards <br /> for an 84-foot-wide right-of-way rural arterial road. (Development Title Section 9-857.4) <br /> e. A community detention pond/terminal drainage system shall be provided to meet the <br /> requirements of the County and to provide adequate drainage for the subdivision, and <br /> the system shall be kept separate from the existing drainage facilities (San Joaquin <br /> County drainage pond). (Development Title Section 9-1135.2) <br /> f. Hydrologic and hydraulic analyses used in the development of the Community Flood <br /> Insurance Studies shall demonstrate that all property, both downstream and upstream of <br /> the discharge, will not be subject to a higher flood level as a result of the proposed <br /> drainage. (San Joaquin County Interim Flood Hazard Reduction Policy) <br /> g. Street lighting shall be provided for the subdivision at all intersections and cul-de-sacs. <br /> (Development Title Section 9-1150.11) <br /> h. The property shall annex to County Service Area No. 29 prior to approval of the Final Map <br /> to provide for the operation and maintenance of the street lighting and storm drainage <br /> facilities. (Development Title Section 9-1100.4) <br /> i. The Traffic Impact Mitigation Fee will be required when the parcels are developed. The <br /> fee is due and payable at the time of building permit application. The fee currently is <br /> $1,900.00 per single-family dwelling unit in the Lodi area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published <br /> by the Engineering News Record. (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174) <br /> j. Spiess Road shall be constructed completely with the first phase between Lower <br /> Sacramento Road and North State Route 99 Frontage Road. (Development Title Section <br /> 9-1100.3) <br /> Conditions of Approval - 2 - SU-93-2 <br />