Laserfiche WebLink
i <br /> i <br /> Chandler Martin 73- <br /> COMIVIENTS ON DEVELOPMENT <br /> PA-04-74(SU) <br /> nd:the <br /> 12 Street;lighting shall be provided for the subdivision a frontage of]Lower Sacramento Road and <br /> Liberty Road''(Development Title::Section 9-1150 11) <br /> l3 Annexation of the development into CSA 29 fo`r water,storm drainage, and street lighting shall be <br /> required prior�to approval of the F�iial Map r <br /> 14 The property shall transfer to a zone within County Service Area No.29 prior to approval of the Fanal <br /> Map to provide for.the operation;maintenance,and improvement of"Water services;stgrin drainage;and, <br /> street lighting facilrt".- Tlie;applicant shall cbihplete the Proposition 218 process for services and pay. <br /> thea fair share to the•CotintyDevelopment will'receive'services conditional:upon cornpletion.of all j <br /> necessary facilities:and passage of Proposition 218 vote..-A new assessment for the zone shall lie. . <br /> a roved b :the rop ert owners. rior torecordin the Final <br /> PP, y P P Y P g Map: The assessment for the new..zone <br /> shall be based on the cost for: iiiaintenance;operation, system improvements; and any replacement <br /> program of facilities within CSA 29_ The applicant shall pay for the cost to process the transfer and <br /> assessment for the new'zone. In addition, the applicant shall pay for the maintenance and operation of <br /> the system from the time the facilities are accepted by the District until the transferred area is placed on <br /> the assessment role of the Distract. (Development Title Section 9-1100.5) <br /> 15. Water meters shall be installed on all water services. (Board of Supervisors Order B-91=650) <br /> M. Offer of Dedication of ground water rights is required on the Final Map. <br /> i <br /> I <br /> 17. All utilities shall be underground except power transmission facilities of a 35 KV or greater. Public <br /> utility easements shall be provided along the road frontage of the subdivision and as required by the <br /> public utility companies. (Development Title Section 9-1155.2) <br /> 18. The subdivider shall agree to and shall pay user fees for the utility services from the time improvements <br /> are accepted by the County until the lots are placed on the County tax rolls, or up to an eighteen-month <br /> period, as the case may be. (Subdivision Map Act Section 66493) j <br /> 19. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control Devices and <br /> San Joaquin County Standards and shall be shown on the improvement plans. <br /> 20. The developer shall obtain all necessary permits from the Air Pollution Control Board for operation of <br /> stand-by generators in conjunction with water well facilities. <br /> 21. A Preliminary Soils Report is required in accordance with the County Standards for the purpose of <br /> determining the R-Value for the design of the roads. (Development Title Section 9-910.2) <br /> 22. The applicant and/or future property owners shall keep the unnamed creek free of all obstacles which <br /> impede the flow of water. Any alteration to the ditches will require obtaining a Watercourse <br /> Encroachment Permit from the San Joaquin County Department of Public Works. <br />