Laserfiche WebLink
Thomas M. Gau <br /> COMMENTS ON DEVELOPMENTS <br /> SA-96-01 <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. (The fee currently <br /> is $149.08 per additional daily trip-end generated in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) Contact the Department of Public Works Public <br /> Facilities Division ((209) 468-3055) for any alternate method of payment allowed for <br /> expansions. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> TMI:RH:lt <br /> PSd9 7 C4 <br /> E: Manuel Lopez, Deputy Director/Development <br />