Laserfiche WebLink
4. No soil will fie stockpiled within the S.S.J.I.D. casements. <br /> 5. No heavy equipment will travel over the S.S.J.LD. fscilitles without approved <br /> bridging, said bridging to be approved between S.S.J.I.D. and the contractor. <br /> 6. No trees and/or rubbish will be disposed of or voted on the S.S.J.I.D. easement or <br /> facilities. <br /> 7. S.S.J.I.D. will be notified 48 hours in advance of any excavation wort. <br /> S. The landowner agrees that the existing concrete lined canal does not presently leek <br /> and agrees that any damage will be repaired at landowners expense. <br /> 9. It is understood by the applicant that the District shad not be held responsible to <br /> remedy high water table problems crated by the excavation. <br /> 10. Landowner shall provide District with sufficient 811 dirt Brom excavation for <br /> protection of canal on both aides and phroe fill dirt u directed by District Engineering <br /> Department <br /> 11. Any irrigation service structure (District or Private) modi8eittion or instigation <br /> naaeitite i by the proposed excavation shell be performed at the landowners <br /> atpase. Furthermore, owner shag obtain s Structure Permit from the District prior <br /> to .modifying or removing any srigation strucdres on Diatrict Btcifines. The <br /> structure shag be installed prior to final acceptance of the excavation. <br /> It is requested that the above stated item be adopted es cotton of approval for the proposed <br /> excavation. If there are any questions, plass feel Bee to oonw meat 823-3101 att.l l 1. <br /> ShiourelY your/4Z <br /> Sam P Bologna <br /> EaginerM Department Supervisor <br /> cc: Rick Martin <br /> c:Wdwe rhriodto <br /> 2 <br />