Laserfiche WebLink
UP-01-06 '"' ••e5 <br /> Page 2 of 2 <br /> C. Submission of three (3) sets of food facility plans to the Environmental Health Division for <br /> review and approval prior to issuance of building permit(s). (California Health and Safety <br /> Code, Section 113915). <br /> D. State on revised site plans the maximum number of employees and customers the sewage <br /> disposal system is being designed for and that the leach field area will be barricaded so it <br /> cannot be driven over, parked on, or used as a storage area. This leach field area must be <br /> used for that specific purpose only and cannot contain any underground utility lines. (San <br /> Joaquin County Development Title, Section 9-1110.4(c)(5)). <br /> E. Construction of individual sewage disposal system(s)under permit and inspection by the <br /> Environmental Health Division is required at the time of development based on the findings <br /> of the Soil Suitability Study (San Joaquin County Development Title, Section 9-1110.3 & 9- <br /> 1110.4). <br /> F. Construct a water well under permit and inspection of the Environmental Health Division <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate a <br /> public water system will be required by the Environmental Health Division (San Joaquin <br /> County Development Title 22, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and—91115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br />