Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0400523 <br /> Girdner <br /> Site Approval Application No. PA-0400523 was approved by the San Joaquin County Community <br /> Development Department on May 26, 2006. The effective date of approval is June 5, 2006. This <br /> approval will expire on December 5, 2007, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Kathy Allen, [209] 953-7509) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an industrial complex in three phases as <br /> shown on the Site Plan dated May 9, 2005. Phase one includes construction of a 127,650 square <br /> foot building. Phase two includes construction of a 76,500 square foot building. Phase three <br /> includes construction of an 81,500 square foot building. The project will be phased over a 4.5 year <br /> period. (Use Type: Wholesaling and Distribution— Light) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. STORM DRAINAGE: Any additional stormwater drainage shall be retained on-site. The drainage <br /> pattern and corresponding storm drain improvements shall be shown on the Site Plan. Drainage <br /> calculations prepared by a registered civil engineer or architect shall be included. (Development Title <br /> Section 9-1135) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9-1015.5[e]) <br /> (2) A minimum of 268 additional parking spaces shall be provided, including 7 accessible spaces, 1 <br /> of which shall be van accessible. Accessible spaces shall be located as close as possible to the <br /> primary entrance (C.C.R., Title 24). (0.5 spaces are required for every 1,000 feet of building <br /> area. 0.5 spaces are required for every employee.)(Development Title Section 9-1015.3) <br /> Conditions of Approval - 1 - PA-0400523 <br />