My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007680
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
15004
>
2600 - Land Use Program
>
QX-98-0001
>
SU0007680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:10 AM
Creation date
9/8/2019 12:41:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007680
PE
2656
FACILITY_NAME
QX-98-0001
STREET_NUMBER
15004
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
APN
02107001
ENTERED_DATE
4/17/2009 12:00:00 AM
SITE_LOCATION
15004 E PELTIER RD
RECEIVED_DATE
4/17/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PELTIER\15004\QX-98-0001\SU0007680\APPL.PDF \MIGRATIONS\P\PELTIER\15004\QX-98-0001\SU0007680\CDD OK.PDF \MIGRATIONS\P\PELTIER\15004\QX-98-0001\SU0007680\EH COND.PDF \MIGRATIONS\P\PELTIER\15004\QX-98-0001\SU0007680\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. HOURS OF OPERATION: Plant operations shall normally be carried on during the hours <br /> from 5:00 a.m. and 9:00 p.m. <br /> h. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of <br /> an excavation, the topsoil shall be replaced and the site leveled in conformance with the <br /> excavation permit. (Development Title Section 9-1415.3[g]) <br /> i. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance <br /> with instructions from the Agricultural Commissioner of San Joaquin County. <br /> (Development Title Section 9-1415.3[h]) <br /> j. SETBACKS: No excavation shall take place within 25 feet of any property line or right-of- <br /> way. (Development Title Section 9-1415.301) <br /> k. TEMPORARY CUT SLOPES AT SETBACK LINES: The temporary cut slope shall not <br /> exceed two (2) feet horizontal to one(1) foot vertical. <br /> I. FINAL SLOPES: Final slopes shall not exceed two (2) feet horizontal to one (1) foot <br /> vertical. A slope stability analysis shall be prepared which takes into account that the final <br /> fill slope is being placed over a cut slope. The minimum slope stability factors shall <br /> comply with requirements of Development Title Section 9-1415.3(k)(4). <br /> M. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the <br /> phases of excavation. Reclamation of the phase of an excavation shall be initiated prior <br /> to the start of the next excavation phase. The final reclamation of any phase of <br /> excavation shall be completed within two years of the commencement of the reclamation <br /> process. Excavation shall be limited so that at any point of time a maximum of one phase <br /> is being reclaimed while one phase is being excavated. (Development Title Section 9- <br /> 1415.3[o]) <br /> n. TIME LIMITATION: The Quarry Excavation Permit shall remain in effect as long as the <br /> excavation continues in compliance with the approved Permit but not longer than the end <br /> of year 2008- (Development Title Section 9-1415.3[p]) <br /> o. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit and the <br /> reclamation plan. The County may use professional services as provided for in Section 9- <br /> 240.11. The consultant shall be selected by San Joaquin County. Upon completion of <br /> the annual inspection, the person in charge of the mining operation shall submit to the <br /> State Geologist and the County a report which shall contain all the information as required <br /> by Section 2207 of the Public Resources Code. The cost of the inspection shall be paid <br /> by the mine operator. Additional inspections may be conducted, but the cost of additional <br /> inspections shall be paid for by the mine operator only if non-compliance with the <br /> conditions of the Quarry Excavation Permit or the reclamation plan is found. <br /> (Development Title Section 9-1415.3[q]) <br /> P. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance <br /> with conditions of approval, and compliance with County and State mining regulations. the <br /> applicant shall provide performance guarantees as a condition of the issuance of the <br /> Quarry Excavation Permit. The amount and form of the guarantee shall be subject to <br /> annual review and approval by the County and the State, and the amount shall be <br /> adequate to ensure reclamation of disturbed land and/or land to be disturbed during a <br /> Conditions of Approval - 2 - QX-98-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.