Laserfiche WebLink
-2- <br /> COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Tom Gau, <br /> (209) 468-2344) <br /> a. APPROVAL: This approval shall be for a three (3) phased excavation of 44- <br /> acres of a 309-acre site, as shown on the Mining and Reclamation Plans dated <br /> May 19, 1998. <br /> b. RECLAMATION PLAN: The Mining and Reclamation Plan shall be prepared by <br /> a registered Civil Engineer, showing drainage, driveway access details, on-site <br /> parking, existing and proposed utility services, grading and reclamation. Storm <br /> drainage runoff shall be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Plan. A plan <br /> check fee as specified by Section 9-240 will be required. The Mining and <br /> Reclamation Plan shall be approved by all agencies with permit authority prior to <br /> initiating the use. <br /> C. STOCKPILES AND SCREENING: No stockpiled soil or material shall be placed <br /> closer than 25 feet to a property boundary except where shown on plans to <br /> provide landscape berm for screening (provided that sight distances at road <br /> intersections are not impaired). (Development Title Section 9-1415.3[b]) <br /> d. PRIVATE ROADS: All private roads involved in an excavation shall be <br /> maintained so as to control the creation of dust. The first one hundred (100) <br /> feet of any private road on the property which intersects with a publicly <br /> maintained road shall be surfaced in a manner approved by the Director. <br /> Traffic-control and warning signs shall be installed, if required, at such <br /> intersection. The placement and size of these signs shall be approved by the <br /> Director of Public Works. (Development Title Section 9-1415.3[c]) <br /> e. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other <br /> approved methods shall be required where necessary for the control of erosion. <br /> An erosion and sediment control plan approved by Development Services <br /> Division shall be part of the reclamation plan. (Development Title Section 9- <br /> 1415.3[d]) <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall <br /> be met unless otherwise modified by conditions of the Quarry Excavation <br /> Permit. (Development Title Section 9-1415.3[e]) <br /> 9. HOURS OF OPERATION: Plant operations shall normally be carried on during <br /> the hours from 5:00 a.m. and 9:00 p.m. <br /> h. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon <br /> completion of an excavation, the topsoil shall be replaced and the site leveled in <br /> conformance with the excavation permit. Development Title Section 9-1415.3[g]) <br /> i. WEED CONTROL: If noxious weeds are on the site, operations shall be in <br /> accordance with instructions from the Agricultural Commissioner of San Joaquin <br /> County. (Development Title Section 9-1415.3[h]) <br />