My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002321
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
1991
>
2600 - Land Use Program
>
UP-93-15
>
SU0002321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:11 AM
Creation date
9/8/2019 12:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002321
PE
2626
FACILITY_NAME
UP-93-15
STREET_NUMBER
1991
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
1991 E PELTIER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PELTIER\1991\UP-93-15\SU0002321\APPL.PDF \MIGRATIONS\P\PELTIER\1991\UP-93-15\SU0002321\CDD OK.PDF \MIGRATIONS\P\PELTIER\1991\UP-93-15\SU0002321\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Planing 2 <br /> length of pipe greater than 3001 . The entire system shall be <br /> looped with no dead end mains . <br /> 4 . Hydrants <br /> All hydrants shall conform to the Standard American Water Works <br /> Association . Enclosed is the Woodbridge Fire District ' s policy on <br /> hydrants . Hydrant spacing shall not be distributed more than 400 ' <br /> apart or no more than 200 ' from the building to be protected (see <br /> last page) . <br /> 5 . Engineering Plans <br /> Engineered plans showing mains, valves and hydrants shall be <br /> submitted to this office for approval prior to installation of the <br /> system. <br /> 6 . Streets and Cul-de-sacs <br /> All streets are to be free of parking and of such width to allow <br /> fire apparatus and other emergency vehicles to access all area . <br /> Streets and water systems are to be in place and operating prior <br /> to the start of construction . <br /> This department feels this project is a major subdivision and not <br /> a labor camp as shown . The 105 units of housing are 120, 750 sq. <br /> ft . of construction . This figure does not take into account the <br /> support buildings . In reality, these are 105 single family units <br /> without a water system or sewer system and would create an <br /> unnecessary burden on the fire district . We understand the need <br /> for this type of housing, but feel this is the wrong location . <br /> I trust you will take the fire protection problem into <br /> consideration when reviewing this application. <br /> Sincerely, <br /> 4HeJ.il/ ht, Fire Chief <br /> HJW: SB <br />
The URL can be used to link to this page
Your browser does not support the video tag.