My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006620
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
7099
>
2600 - Land Use Program
>
PA-0700298
>
SU0006620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:35 AM
Creation date
9/8/2019 12:42:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006620
PE
2631
FACILITY_NAME
PA-0700298
STREET_NUMBER
7099
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00526042
ENTERED_DATE
7/10/2007 12:00:00 AM
SITE_LOCATION
7099 E PELTIER RD
RECEIVED_DATE
7/10/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PELTIER\7099\PA-0700298\SU0006620\APPL.PDF \MIGRATIONS\P\PELTIER\7099\PA-0700298\SU0006620\CDD OK.PDF \MIGRATIONS\P\PELTIER\7099\PA-0700298\SU0006620\EH COND.PDF \MIGRATIONS\P\PELTIER\7099\PA-0700298\SU0006620\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Community Development Department has reviewed the Site Approval application <br /> and responses frorn other agencies, and providing any outstanding issues have been <br /> resolved, will approve the project subject to the following conditions,- <br /> Site <br /> onditions:Site Approval Application No. PA-0700298 was approved by the San Joaquin <br /> County Community Development Department on. The effective date of approval is. <br /> This approval will expire on, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary <br /> building permits have been secured and remain in force, and (3) all necessary <br /> permits from other agencies have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as Ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other Ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Corinne King, 953- <br /> 7509) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the "SITE PLAN CHECK <br /> LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for a small winery with a tasting room and <br /> marketing events as shown on the Plan dated June 19, 2007. (Use Type: Wineries <br /> and Wine Cellars-Small). <br /> c. PRODUCTION CAPACITY: The small winery shall have a minimum production <br /> capacity of 1.1 tons of grapes or approximately two hundred one (201) gallons of <br /> wine and a maximum production capacity of two hundred (200) tons of grapes or <br /> approximately thirty-six thousand (38,000) gallons of wine per year. (Development <br /> Title Section 9-1075.51x]). <br /> d WINE TASTING: The maximum size of the area designated for wine tasting room <br /> structure or an area designated for wine tasting within a multipurpose building at an <br /> on-site wine cellar shall not exceed thirty percent (30%) of the area designated for <br /> production facilities or two thousand (2,000) square feet whichever is greater. <br /> e MARKETING EVENTS: Marketing Events are subject to the following regulations: <br /> 1) A maximum of two (2) marketing events are permitted annually as a part of the <br /> proposed marketing plan. <br /> 2) Marketing events shall end by 10,00 p m. (Development Title Section 9- <br /> 1075 8[m]121)- <br />
The URL can be used to link to this page
Your browser does not support the video tag.