Laserfiche WebLink
f. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> 3. PUBLIC HEALTH SERVICES (Staff Contact: Johnny Yoakum,468-3147) <br /> a. Prior to the issuance of any building permits,sewer facilities shall either be bonded for or be in place, <br /> as evidenced by a letter from the serving entity. (Development Title Section 9-1100.3[d]) <br /> b. This project shall be provided with public water service at the time of final approval. Prior to final <br /> approval,a letter shall be submitted from the purveyor stating that these services are either bonded <br /> for or are in place. <br /> c. Open, pump, and backfill the septic tank, seepage pit, or excavation under permit and inspection by <br /> the Environmental Health Division. (Development Title Sections 9-1110.3 and 9-1110.4) <br /> d. The existing private water wells shall be tested for the chemical dibromochloropropane(DBCP)and <br /> nitrates prior to final approval. Samples are to be taken and analyzed by a State approved <br /> laboratory. (Development Title Section 9-1115.7) <br /> Conditions of Approval -4 - UP-99-20 <br />