Laserfiche WebLink
UP-99-20 <br /> Page 2 of 2 <br /> D. Submit a site plan or map plan to the Environmental Health Division showing sewage and <br /> well information that clearly delineates the proposed locations as required by ordinance <br /> requirements (San Joaquin County Development Title, Section 9-1110.4). <br /> E. Construct a water well under permit and inspection of the Environmental Health Division <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate a <br /> public water system will be required by the Environmental Health Division (San Joaquin <br /> County Development Title 22, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and—91115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br />