Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> UP-00-08 <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is <br /> due and payable at the time of final Site Plan approval. The fee currently is $167.69 <br /> per additional daily trip-end generated in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record. <br /> (Resolutions R-90-304, R-9'-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plar shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:mr <br /> PS-0EWRM3 <br /> E: Manuel Lopez, Director of Public Works <br />