My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005295
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10600
>
2600 - Land Use Program
>
SU-91-12
>
SU0005295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:56 PM
Creation date
9/8/2019 12:49:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005295
PE
2611
FACILITY_NAME
SU-91-12
STREET_NUMBER
10600
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
APN
08607035
ENTERED_DATE
8/15/2005 12:00:00 AM
SITE_LOCATION
10600 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\jcastaneda
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\10600\SU-91-12\SU0005295\SURV MEMO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 7 <br /> PC: 10-1-92 . <br /> SU-91-12 <br /> Page 2 <br /> 7. The design of the subdivision or the type of improvements will not conflict with easements, <br /> acquired by the public at large, for access through or use of property within the proposed <br /> subdivision. <br /> • This Finding can be made because there are no public easements on this property. <br /> 8. Any land or improvements to be dedicated to the County are consistent with the General Plan. <br /> • This Finding can be made because all land or Improvements to be dedicated will meet <br /> County requirements. <br /> PROJECT DESCRIPTION <br /> This project is a Major Subdivision application to subdivide a 27-acre parcel into 24 lots. Lot sizes will <br /> range from.91 acre to 1.47 acre. This project is being processed under the 2010 General Plan. Services <br /> will be provided as follows: <br /> • Water will be provided by County Service Area No. 46. <br /> • Sewer will be provided by private septic systems on each lot. <br /> • Storm drainage will be provided by County Service Area No. 46 with terminal drainage into <br /> Mosher Slough. <br /> The applicant is phasing this subdivision. Phase I will include the six lots on the east end of the <br /> subdivision(Lots 1-6). Phase II will complete the subdivision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.