Laserfiche WebLink
RECEIVED aoV..:�o a...JP. <br /> 0100�........�0 SEP 2 5 2013 M NEW ROOPIOYE2 <br /> WaterBoards Rellhotheenul°ROteC1px <br /> . GN.nIGefT� <br /> Central Valley Regional Water Quality CSI�T11S <br /> 20 September 2013 <br /> Mr. Matt Belair <br /> Delicato Family Vineyards <br /> 12001 South Highway 99 <br /> Manteca, CA 95336 <br /> APPROVAL OF WASTEWATER SYSTEMS IMPROVEMENT COMPLETION REPORT, <br /> DELICATO FAMILY VINEYARDS, SAN JOAQUIN COUNTY <br /> Thank you for submitting the Wastewater Systems Improvement Completion Report (the <br /> completion report) for Delicato Family Vineyards (Delicato), which we received on <br /> 30 August 2013. The completion report summarized the construction of a process water <br /> storage system at the winery in accordance with Provision H.1.c of Waste Discharge <br /> Requirements (WDRs) Order R5-2013-0028, which was adopted on 12 April 2013. Provision <br /> H.1.c of the WDRs requires that Delicato submit a Wastewater System Improvements <br /> Completion Report that documents the following: <br /> 1. Construction of the two lined aeration ponds and certification that the ponds are fully <br /> functional and ready to receive wastewater. <br /> 2. Improvements to LAAs 1 through 6 have been completed as described in Finding 32 <br /> and that the LAAs are fully functional and ready to receive wastewater. <br /> 3. As-built drawings of the new LAA irrigation and tailwater/storm water runoff control <br /> systems. <br /> 4. A Liner Construction Quality Assurance (CQA) Report that documents all construction <br /> observation, testing, and test results for the pond lining system. <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff has <br /> reviewed the report and determined that it contains the information required under the WDRs. <br /> Specifically, installation of the aeration pond liner system was conducted in accordance with <br /> an approved Construction Quality Assurance Plan, which was included as part of the <br /> Wastewater Pond Report Compilation dated 30 April 2013. The compilation report <br /> documented the installation and testing of the pond liner system. The expanded Land <br /> Application Areas (LAAs) 1 through 4 and 6 were previously approved in our letter dated <br /> 12 July 2013, while completion of LAA 5 was documented in the completion report. Finally, <br /> the completion report documented that all irrigation equipment and tailwater controls have <br /> been installed on LAAs 1 through 6 and that the LAAs are cropped and ready for use. <br /> KARL E. LONGLEY SCD, P.E.,CHAIR I PAMELA C. CREEOON P.E.. EICEE.EXECUTIVE OFFICER <br /> 11020 Sun Center DrWe 12o0.Rancho Cordova.CA 95670 1 were waterboerCa.ce.govicantralvelley <br /> CI Recrc F-E. <br />