My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008766
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
12001
>
2600 - Land Use Program
>
PA-1100091
>
SU0008766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:02 PM
Creation date
9/8/2019 12:51:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008766
PE
2690
FACILITY_NAME
PA-1100091
STREET_NUMBER
12001
Direction
S
STREET_NAME
STATE ROUTE 99
City
MANTECA
APN
20404007 09
ENTERED_DATE
5/26/2011 12:00:00 AM
SITE_LOCATION
12001 S HWY 99
RECEIVED_DATE
5/26/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\12001\PA-1100091\SU0008766\APPL.PDF \MIGRATIONS\N\HWY 99\12001\PA-1100091\SU0008766\CDD OK.PDF \MIGRATIONS\N\HWY 99\12001\PA-1100091\SU0008766\EH COND.PDF \MIGRATIONS\N\HWY 99\12001\PA-1100091\SU0008766\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Matt Belair - 2 - 12 July 2013 <br /> Delicato Family Vineyards <br /> Details of the proposed wastewater aeration pond system design.. specifications, and schedule <br /> are consistent with requirements outlined in Order R5-2012-0028, therefore the Wastewater <br /> Pond Design is hereby approved. In accordance with the Flow Limitations of the WDRs, the <br /> flow limit will not be increased until the Executive Officer has approved the Wastewater System <br /> Improvements Completion Report. which is required to be submitted by 1 September 2013. <br /> Pond Liner Construction Quality Assurance (CQA) Plan <br /> Provision H.1.a of the WDRs required submittal of a CQA Plan that specifies the final design of <br /> the wastewater ponds and liner systems, liner material specifications, seaming methods, and <br /> details of anchorage and penetrations. Construction quality assurance procedures and test <br /> methods to ensure and verify that the liner subgrade preparation, installation, seaming, and <br /> integrity testing will be performed in accordance with the manufacturer's recommendations are <br /> summarized in the Process Water Storage and Related Improvements Project Manual <br /> (Appendix B of the workplan). <br /> Aeration pond excavation and construction will be conducted per recommendations made by a <br /> geotechnical engineer while all pipe penetrations, anchor connections, and other structural <br /> supports will be assembled per the manufacturer's specifications and under the direction of the <br /> CQA consultant. Field testing of the liner seams and welds will include non-destructive and <br /> destructive techniques to verify adequate integrity per ASTM D 5641 and ASTM D 5820. All <br /> liner installation, seam welding, and inspections will be performed by a licensed contractor <br /> under the direction of a licensed Civil or Structural Engineer. <br /> The CQA Plan provides sufficient detail of the proposed pond system design and specifications <br /> as required in Order R5-2012-0028 and is hereby approved. Use of the aeration ponds will not <br /> be allowed until after the Executive Officer approves the Wastewater System Improvements <br /> Completion Report, which is required to be submitted by 1 September 2013. <br /> Unlined Pond Closure Plan <br /> Provision H.1.a requires that an Unlined Wastewater Pond Closure Plan provide the process to <br /> be taken to close the existing two-acre unlined wastewater ponds and the specific methods that <br /> will be implemented to remove sludge and waste-containing sediments, verify adequate waste <br /> removal, document disposal, and describe additional actions to reduce future percolation of <br /> residual waste constituents in soil if the ponds are converted for the storage of irrigation water. <br /> The Unlined Pond Closure Plan proposes a two-step process to characterize soil conditions and <br /> implement closure of the area in preparation for other uses. After construction and certification <br /> of the new aeration ponds, the unlined ponds will be drained and dried. Trenching and soil <br /> sampling will then be conducted to characterize the nature and extent of sludge in the bottom <br /> and sidewalls of the unlined ponds. Soil samples will analyzed for nitrate as nitrogen, total <br /> Kjeldahl nitrogen, electrical conductivity, pH, and total organic carbon. Sampling and analysis of <br /> nearby shallow soil conditions will be also conducted for comparative purposes. <br /> After the completion of soil/sludge characterization activities, submittal of a separate Removal <br /> Closure Plan is proposed to provide appropriate documentation for mitigation related activities <br /> (i.e. Grading Permit, Stormwater Pollution Prevention Plan, Transportation Plan, Dust Control <br /> Plan, etc.). The excavation plan portion of the Removal Closure Plan would provide the results <br /> of soil and sludge characterization and the technical rationale for defining the estimated spatial <br /> extent and volume of impacted material that will be removed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.