My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008766
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
12001
>
2600 - Land Use Program
>
PA-1100091
>
SU0008766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:02 PM
Creation date
9/8/2019 12:51:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008766
PE
2690
FACILITY_NAME
PA-1100091
STREET_NUMBER
12001
Direction
S
STREET_NAME
STATE ROUTE 99
City
MANTECA
APN
20404007 09
ENTERED_DATE
5/26/2011 12:00:00 AM
SITE_LOCATION
12001 S HWY 99
RECEIVED_DATE
5/26/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\12001\PA-1100091\SU0008766\APPL.PDF \MIGRATIONS\N\HWY 99\12001\PA-1100091\SU0008766\CDD OK.PDF \MIGRATIONS\N\HWY 99\12001\PA-1100091\SU0008766\EH COND.PDF \MIGRATIONS\N\HWY 99\12001\PA-1100091\SU0008766\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t. P I V 4 n. EDmuND G. BRowx JR. <br /> . . ��J ovaxxox <br /> JUL 16 2013 MA TxEw Ro9RETARY FOR <br /> RI9uEz <br /> Water Boards <br /> EM!Mt IINMENTALHEA°T I <br /> Central Valley Regional Water Quail? cortti01(hoard <br /> 12 July 2013 <br /> Mr. Matt Belair <br /> Delicato Family Vineyards <br /> 12001 South Highway 99 <br /> Manteca, CA 95336 <br /> REVIEW OF WASTEWATER POND COMPILATION AND REVISED WASTEWATER <br /> SYSTEM IMPROVEMENT REPORTS, DELICATO FAMILY VINEYARDS, <br /> SAN JOAQUIN COUNTY <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff <br /> reviewed two documents submitted by Kennedy Jenks Consultants on behalf of Delicato Family <br /> Vineyards (Delicato). The reports were submitted pursuant to Waste Discharge Requirements <br /> (WDRs) Order R5-2013-0028, which was adopted on 12 April 2013. <br /> Delicato owns and operates 140-acres of vineyards and a winery and currently processes <br /> wastewater through two shallow unlined wastewater ponds and then discharged to a 23 acre <br /> uncropped Land Application Area (LAA). Several progress reports and work plans are required <br /> under Order R5-2013-0028 to monitor the progress of facility expansion activities before an <br /> increase in wastewater flow and acres of LAAs can be approved. This letter provides <br /> comments on a Wastewater Pond Report Compilation, dated 30 April 2013, and a Revised <br /> Wastewater System Improvement Completion Report: Improvement to Land Application Areas, <br /> dated 8 May 2013. <br /> Wastewater Pond Report Compilation, 30 April 2013, (Compilation Report) <br /> As required by Provision H.1.a of the WDRs, the Wastewater Pond Compilation Report provided <br /> an aeration pond design workplan, a liner Construction Quality Assurance (CQA) Plan, and a <br /> closure plan for two existing unlined wastewater ponds at the facility. A review of these <br /> documents is provided below. <br /> Wastewater Pond Design <br /> The Wastewater Pond Design states that process wastewater will be pumped from three <br /> existing sumps located within the winery through two mechanical screens and then to two new <br /> 0.25 million gallon aeration ponds before discharge to 130 acres of LAAs. The two aeration <br /> ponds will be built to provide flow equalization, manage peak crush season flow and to provide <br /> system redundancy during routine maintenance. The aeration ponds will be constructed with a <br /> single-layer geomembrane 60-mil high density polyethylene (HDPE) liner, which will be installed <br /> by a licensed liner installation contractor. Liner installation, welding of seams, field testing, <br /> inspection, and liner repair procedures will be performed in accordance with the Process Water <br /> Storage and Related Improvements Project Manual (Appendix B of the workplan). <br /> KARL E. LONOLEY Sc D, P.E.,CHAIR I PAMELA C. CPEEOON P.E., BCEE.EXECUTIVE OFFICER <br /> 11020 Son Center Drive#200.Rarcho ODr°ova,GA 95870 1www.waterboerOs.ca.9ov/eanvalvall°y <br /> 4#xamab°rnree <br />
The URL can be used to link to this page
Your browser does not support the video tag.