Laserfiche WebLink
PQU.!N <br /> Q <br /> COUNTY OF SAN JOAUIN <br /> THOMAS R. FLINN <br /> " V _ DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> ; P. P. O. BOX 1810- 1810 E. HAZELTON AVENUE <br /> 0 STOCKTON, CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> March 19, 2001 <br /> RECEIVED <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> MAR 2 9 2001 <br /> Community Development Department <br /> CONTACT PERSON: Leanne Mueller Community Development Dept. <br /> FROM: G�Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-20 A SITE APPROVAL APPLICATION FOR A MANUFACTURED <br /> HOMES SALES LOT WITH AN OFFICE 30 FEET BY 50 FEET, LOCATED <br /> ON THE SOUTHWEST CORNER OF STATE ROUTE 99 FRONTAGE ROAD <br /> AND LATHROP ROAD. <br /> (DISTRICT 5) <br /> APPLICANT: Kuloid Kava Singh APN: 218-020-02 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> South 99 Frontage East has an existing right-of-way width of 56 feet and a planned right-of-way <br /> width of 56 feet. Lathrop Road has an existing variable right-of-way width and a planned <br /> right-of-way width of the same. <br /> RECOMMENDATIONS: <br /> 1. An Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $157.45 per <br /> daily trip-end or$1,511 per 1,000 gross square foot of building designated as Office <br /> generated in the Lathrop area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) <br /> this site was in epeffltian OM OF afteF ApFil 23, 199,9—. <br /> (Resolution R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:mr <br /> PS-1C113-MIF <br />