Laserfiche WebLink
MONITORING AND ROYORTING PROGRAM NO. 5-01-057 `� a <br /> WOODBRIDGE PARTNERS INC. <br /> VICTOR FINE FOODS FACILITY <br /> FOR CLOSURE OF SURFACE IMPOUNDMENTS AND INJECTION WELL <br /> SAN JOAQUIN COUNTY <br /> Table 1 - Surface Impoundment Monitoring <br /> Parameters Units Frequence <br /> Field Parameter <br /> Feet&Tenths <br /> Freeboard °C Semi-atmually <br /> Temperature umbos/cm Semi-annually <br /> Specific Conductance Semi-annually <br /> pH pH number Semi-annually <br /> Monitoring Parameters mg/L <br /> Total Dissolved Solids mg/L Semi-annually <br /> Total Suspended Solids / Semi-annually <br /> mg <br /> /L Semi-annually <br /> TPH-oil & grease tmg2 Semi-annually <br /> Chloride Semi-annually <br /> Sulfate mgt <br /> Semi-atmually <br /> Nitrate -Nitrogen mg/L. Semi-annually <br /> 3. Groundwater Monitoring <br /> The discharger shall establish an evaluation monitoring program within 90 days of adoption of <br /> Waste Discharge Requirements Order No. 5-01-057. In order to fully characterize the horizontal <br /> and vertical extent of pollution in groundwater additional wells must be installed for this site. <br /> Board staff must approve monitoring well location and construction details prior to well <br /> installation. <br /> Subsequent to establishment of the evaluation monitoring program, the following monitoring <br /> wells will be sampled to determine compliance with the Water Quality Protection Standards and <br /> to begin data collection for design of corrective actions: <br /> Zone Background Compliance Evaluation <br /> Wells Well Wells <br /> A MW-1A MW-4A MW-2A, -3A, -5A <br /> B MW-1B MW-2B, -3B, -513 <br /> C MWAC MW-2C, -3C, -5C <br /> D MW-6D <br /> Groundwater elevations shall be measured semi-annually in all monitoring wells at the facility. <br /> Groundwater elevations shall be plotted to produce a groundwater contour map. <br />