Laserfiche WebLink
Kerry Sullivan -3- <br /> COMMUNITY DEVELOPMENT <br /> PA-02-509 <br /> 7. Verification shall be obtained from the Solid Waste Division (468-3066)that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> 8. Storm drainage shall be retained on site within a storm basin less than or equal to 18" in <br /> depth. <br /> 9. A Traffic Study is required prior to approval of this development due to potential traffic <br /> generated by the proposed development. The Developer shall pay all costs incurred by the <br /> County related to said study. Any mitigation required by the traffic study shall be <br /> provided by the applicant prior to final occupancy. <br /> GK:BN:ar <br /> P.\COMMENTS\SA\Yr 2002\PA-02-509.wpd <br />